Assessment Year | 2004 |
---|---|
Principal Product | Asphalt Products |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $50 M to 100M |
# of Employees | 50 |
Plant Area |
435,600
ft2
|
Annual Production | 12,000
Tgal
|
Production Hrs. Annual | 3,432
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,260 | 907,734 |
kWh
|
$0.074 |
Electricity Demand | $56,254 | 4,968 |
kW-mo/yr
|
$11.32 |
Natural Gas | $378,070 | 59,980 |
MMBtu
|
$6.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,743 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,506 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $17,133 | - | - |
$12,744
-
kW-mo/yr
|
- | - | - | $4,389 | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $13,549 | $34,600 | - | - |
$13,549
-
MMBtu
|
- | - | - | |
03 | 4.513: Re-arrange equipment layout to reduce labor costs | $13,847 | $40,000 |
$(-1,124.0)
(-21,875)
kWh
|
$(-3,038.0)
-
kW-mo/yr
|
- |
$300
-
MMBtu
|
$17,709 | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,529 | - | - | - |
$10,529
-
MMBtu
|
- | - | - | |
05 | 2.2511: Insulate bare equipment | $3,977 | $4,500 | - | - |
$3,977
-
MMBtu
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,708 | $3,213 |
$1,270
24,710
kWh
|
$438
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $60,743 | $82,313 |
$146
2,835
kWh
|
$10,144
-
kW-mo/yr
|
$28,055
-
MMBtu
|
$300
-
MMBtu
|
$17,709 | $4,389 | ||
TOTAL IMPLEMENTED | $14,506 | $4,500 | - | - |
$14,506
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs