Assessment Year | 2019 |
---|---|
Principal Product | Animal Feed |
NAICS | 311119: Other Animal Food Manufacturing |
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $10 M to 50M |
# of Employees | 47 |
Plant Area |
126,216
ft2
|
Annual Production | 175,000
ton
|
Production Hrs. Annual | 4,784
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $352,935 | 5,927,200 |
kWh
|
$0.060 | |
Electricity Demand | $167,842 | 24,235 |
kW-mo/yr
|
$6.93 | |
Electricity Fees | $5,445 | - |
|
- | |
Natural Gas | $95,552 | 28,111 |
MMBtu
|
$3.40 | |
Waste Disposal Costs | |||||
Water Usage | $19,796 | 2,765 |
Tgal
|
$7.16 | |
Water Disposal | $9,317 | 2,765 |
Tgal
|
$3.37 | |
TOTAL YEARLY COSTS | $650,887 | ||||
RECOMMENDED SAVINGS* | $17,547 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $11,882 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7211: Clean and maintain refrigerant condensers and towers | $957 | $524 |
$624
10,400
kWh
|
$333
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,490 | $4,312 |
$1,776
29,598
kWh
|
$714
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,570 | $850 |
$1,570
26,172
kWh
|
- | - | - | |
04 | 2.2136: Install / repair insulation on steam lines | $6,865 | $426 | - | - |
$6,865
-
MMBtu
|
- | |
05 | 2.8117: Install sub-metering equipment | $5,665 | $887 | - | - | - | $5,665 | |
TOTAL RECOMMENDED | $17,547 | $6,999 |
$3,970
66,170
kWh
|
$1,047
-
kW-mo/yr
|
$6,865
-
MMBtu
|
$5,665 | ||
TOTAL IMPLEMENTED | $11,882 | $6,112 |
$3,970
66,170
kWh
|
$1,047
-
kW-mo/yr
|
$6,865
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs