ITAC Assessment: OK1021
ITAC logo
ITAC Assessment: OK1021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Animal Feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 47
Plant Area 126,216
ft2
Annual Production 175,000
ton
Production Hrs. Annual 4,784
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $352,935 5,927,200
kWh
Electricity Demand $167,842 24,235
kW-mo/yr
Electricity Fees $5,445 -
Natural Gas $95,552 28,111
MMBtu
Waste Disposal Costs
Water Usage $19,796 2,765
Tgal
Water Disposal $9,317 2,765
Tgal
TOTAL YEARLY COSTS $650,887
RECOMMENDED SAVINGS* $17,547 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,882

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7211: Clean and maintain refrigerant condensers and towers $957 $524 $624
10,400
kWh
$333
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,490 $4,312 $1,776
29,598
kWh
$714
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,570 $850 $1,570
26,172
kWh
- - -
04 2.2136: Install / repair insulation on steam lines $6,865 $426 - - $6,865
-
MMBtu
-
05 2.8117: Install sub-metering equipment $5,665 $887 - - - $5,665
TOTAL RECOMMENDED $17,547 $6,999 $3,970
66,170
kWh
$1,047
-
kW-mo/yr
$6,865
-
MMBtu
$5,665
TOTAL IMPLEMENTED $11,882 $6,112 $3,970
66,170
kWh
$1,047
-
kW-mo/yr
$6,865
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs