Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

559

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Animal food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0549 #05 Y:2017 Establish a predictive maintenance program $3,241 $1,000
WV0549 #04 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $3,263 $11,180
WV0549 #03 Y:2017 Use photocell controls $4,781 -
WV0549 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $7,549 -
WV0549 #01 Y:2017 Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $41,748 $105,000
UF0507 #06 Y:2017 Install adequate dryers on air lines to eliminate blowdown $3,808 -
UF0507 #05 Y:2017 Install an uninteruptable power supply $14,679 $43,710
UF0507 #04 Y:2017 Increase amount of condensate returned $814 $876
UF0507 #03 Y:2017 Install compressor air intakes in coolest locations $2,363 $210
UF0507 #02 Y:2017 Install / repair insulation on steam lines $2,643 $3,762
UF0507 #01 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $6,676 $1,124
SF0500 #06 Y:2017 Use solar heat to make electricty $80,824 $383,827
SF0500 #05 Y:2017 Change rate schedules or other changes in utility service $3,907 -
SF0500 #04 Y:2017 Reschedule plant operations or reduce load to avoid peaks $7,463 -
SF0500 #03 Y:2017 Reduce the pressure of compressed air to the minimum required $760 $2,070
SF0500 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $3,814 $7,558
SF0500 #01 Y:2017 Install / repair insulation on steam lines $161 $294
AM0727 #08 Y:2017 Install occupancy sensors $998 $1,980
AM0727 #07 Y:2017 Utilize higher efficiency lamps and/or ballasts $1,077 $1,960
AM0727 #06 Y:2017 Eliminate or reduce compressed air usage $1,352 $210