Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2406 #09 Y:2024 Use outside cold water source as a supply of cooling water $35,350 $159,350
UL2406 #08 Y:2024 Use solar heat to make electricty $78,236 $775,946
UL2406 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $3,544 $12,225
UL2406 #06 Y:2024 Remove or close off unneeded compressed air lines $4,470 $1,120
UL2406 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $20,826 $10,980
UL2406 #04 Y:2024 Install occupancy sensors $112 $406
UL2406 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $17,721 $15,563
UL2406 #02 Y:2024 Optimize plant power factor $7,741 $12,220
UL2406 #01 Y:2024 Optimize plant power factor $21,720 $14,950
UL2303 #07 Y:2023 Use outside cold water source as a supply of cooling water $6,194 $25,900
UL2303 #06 Y:2023 Install desiccant humidity control system $7,161 $21,450
UL2303 #05 Y:2023 Use solar heat to make electricty $36,831 $336,395
UL2303 #04 Y:2023 Use waste heat from hot flue gases to preheat $4,140 $7,650
UL2303 #03 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $16,439 $34,126
UL2303 #02 Y:2023 Reduce the pressure of compressed air to the minimum required $8,504 -
UL2303 #01 Y:2023 Optimize plant power factor $43,641 $26,163
UL2203 #06 Y:2022 Use solar heat to make electricty $26,616 $369,011
UL2203 #05 Y:2022 Optimize plant power factor $79,271 $45,460
UL2203 #04 Y:2022 Use / purchase optimum sized compressor $4,720 $15,000
UL2203 #03 Y:2022 Reduce the pressure of compressed air to the minimum required $6,985 -