Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,054

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0345 #04 Y:2025 Install occupancy sensors $1,024 $690
TT0345 #03 Y:2025 Analyze flue gas for proper air/fuel ratio $6,868 $1,400
TT0345 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $4,717 $60
TT0345 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $12,654 $8,950
LT8428 #10 Y:2025 Meter waste water $137,771 $13,815
LT8428 #09 Y:2025 Use solar heat to make electricty $150,032 $2,112,000
LT8428 #08 Y:2025 Use photocell controls $417 $340
LT8428 #07 Y:2025 Reduce the pressure of compressed air to the minimum required $2,778 -
LT8428 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $56,354 $50,550
LT8428 #05 Y:2025 Use most efficient type of electric motors $40,176 $29,500
LT8428 #04 Y:2025 Optimize plant power factor $2,409 $19,947
LT8428 #03 Y:2025 Modify refrigeration system to operate at a lower pressure $48,711 $140,984
LT8428 #02 Y:2025 Increase amount of condensate returned $194,116 $260,000
LT8428 #01 Y:2025 Reduce excessive boiler blowdown $18,242 $6,000
UU0285 #10 Y:2025 Install occupancy sensors $3,820 $17,670
UU0285 #09 Y:2025 Utilize higher efficiency lamps and/or ballasts $8,110 $41,570
UU0285 #08 Y:2025 Pay bills on time to avoid late fees $694 $720
UU0285 #07 Y:2025 Reduce fluid flow rates $2,210 $30,850
UU0285 #06 Y:2025 Eliminate or reduce compressed air usage $2,160 $1,440
UU0285 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,700 $2,950