Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

264

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0660 #04 Y:2015 Use solar heat to make electricty $8,242 $54,525
OR0660 #03 Y:2015 Reduce the pressure of compressed air to the minimum required $1,283 $1,500
OR0660 #02 Y:2015 Install occupancy sensors $3,310 $8,500
OR0660 #01 Y:2015 Change procedures / equipment / operating conditions $135,000 $250,000
OR0659 #08 Y:2015 Utilize energy-efficient belts and other improved mechanisms $1,463 -
OR0659 #07 Y:2015 Insulate bare equipment $1,353 $8,000
OR0659 #06 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $6,165 $3,410
OR0659 #05 Y:2015 Improve combustion control capability $4,259 $5,617
OR0659 #04 Y:2015 Insulate bare equipment $6,192 $8,000
OR0659 #03 Y:2015 Utilize energy-efficient belts and other improved mechanisms $906 $900
OR0659 #02 Y:2015 Minimize contamination of water before treatment $26,260 $7,200
OR0659 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $10,705 $20,000
OR0655 #09 Y:2015 Use solar heat to make electricty $2,480 $20,979
OR0655 #08 Y:2015 Recover waste heat from equipment $4,958 $7,816
OR0655 #07 Y:2015 Modify refrigeration system to operate at a lower pressure $51,916 $126,000
OR0655 #06 Y:2015 Add equipment/ operators to reduce production bottleneck $180,695 $251,760
OR0655 #05 Y:2015 Flash condensate to produce lower pressure steam $15,571 $19,050
OR0655 #04 Y:2015 Adjust / maintain fork lift trucks for most efficient operation $175,008 $188,400
OR0655 #03 Y:2015 Turn off equipment when not in use $20,211 $1,000
OR0655 #02 Y:2015 Analyze flue gas for proper air/fuel ratio $4,161 $1,000