ITAC Assessment: OR0659
ITAC logo
ITAC Assessment: OR0659
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Seafood
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2077: Animal and Marine Fats and Oils
Sales Range $100
M
to 500
M
# of Employees 269
Plant Area 210,000
ft2
Annual Production 57,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $545,525 9,411,920
kWh
Electricity Demand $179,517 20,850
kW-mo/yr
Electricity Fees $66,824 -
Natural Gas $108,535 29,043
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,510

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,705 $20,000 $8,485
137,254
kWh
$2,423
-
kW-mo/yr
- - $726 $(-929.0) -
02 3.4131: Minimize contamination of water before treatment $26,260 $7,200 - - - - $(-3,740.0) - $30,000
-
Tgal
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $906 $900 $906
14,663
kWh
- - - - - -
04 2.2511: Insulate bare equipment $6,192 $8,000 $(-24.0)
(-382)
kWh
- - $6,216
-
gal
- - -
05 2.1116: Improve combustion control capability $4,259 $5,617 $655
10,595
kWh
- $3,604
-
MMBtu
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,165 $3,410 $6,165
99,723
kWh
- - - - - -
07 2.2511: Insulate bare equipment $1,353 $8,000 - - $1,353
-
MMBtu
- - - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,463 - $1,154
18,669
kWh
$309
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $57,303 $53,127 $17,341
280,522
kWh
$2,732
-
kW-mo/yr
$4,957
-
MMBtu
$6,216
-
gal
$(-3,014.0) $(-929.0) $30,000
-
Tgal
TOTAL IMPLEMENTED $44,510 $43,200 $8,461
136,872
kWh
$2,423
-
kW-mo/yr
$1,353
-
MMBtu
$6,216
-
gal
$(-3,014.0) $(-929.0) $30,000
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs