10,216
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LL0257 #03 Y:2006 | 03 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $20,217 | $7,960 | |
| LL0257 #02 Y:2006 | 02 | 2006 | Repair and eliminate steam leaks | $302,971 | $5,510 | |
| LL0257 #01 Y:2006 | 01 | 2006 | Preheat boiler makeup water with waste process heat | $501,312 | $98,000 | |
| OR0501 #07 Y:2006 | 07 | 2006 | Reduce the pressure of compressed air to the minimum required | $4,100 | - | |
| OR0501 #06 Y:2006 | 06 | 2006 | Install occupancy sensors | $8,560 | $100 | |
| OR0501 #05 Y:2006 | 05 | 2006 | Shut off cooling if cold outside air will cool process | $25,000 | $3,400 | |
| OR0501 #04 Y:2006 | 04 | 2006 | Establish burner maintenance schedule for boilers | $31,700 | $105 | |
| OR0501 #03 Y:2006 | 03 | 2006 | Utilize energy-efficient belts and other improved mechanisms | $41,300 | $59,700 | |
| OR0501 #02 Y:2006 | 02 | 2006 | Replace fossil fuel equipment with electrical equipment | $72,600 | $1 | |
| OR0501 #01 Y:2006 | 01 | 2006 | Increase amount of condensate returned | $119,000 | $200 | |
| LL0256 #11 Y:2006 | 11 | 2006 | Utilize higher efficiency lamps and/or ballasts | $785 | $700 | |
| LL0256 #10 Y:2006 | 10 | 2006 | Use photocell controls | $870 | $90 | |
| LL0256 #09 Y:2006 | 09 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,347 | $640 | |
| LL0256 #08 Y:2006 | 08 | 2006 | Install occupancy sensors | $2,768 | $210 | |
| LL0256 #07 Y:2006 | 07 | 2006 | Reduce the pressure of compressed air to the minimum required | $5,368 | $30 | |
| LL0256 #06 Y:2006 | 06 | 2006 | Eliminate leaks in water lines and valves | $7,057 | $1,330 | |
| LL0256 #05 Y:2006 | 05 | 2006 | Reduce illumination to minimum necessary levels | $12,350 | $720 | |
| LL0256 #04 Y:2006 | 04 | 2006 | Insulate bare equipment | $20,392 | $3,960 | |
| LL0256 #03 Y:2006 | 03 | 2006 | Insulate bare equipment | $35,700 | $11,209 | |
| LL0256 #02 Y:2006 | 02 | 2006 | Increase amount of condensate returned | $111,471 | $70,939 |