ITAC Assessment: LL0256
ITAC logo
ITAC Assessment: LL0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Chicken Products
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 125,000
ft2
Annual Production 208,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,337,263 37,017,180
kWh
Electricity Demand $234,907 74,381
kW-mo/yr
Electricity Fees $126,945 -
Natural Gas $1,518,292 148,829
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $418,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $398,467

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
01 2.2135: Repair and eliminate steam leaks $219,845 $2,900 - - - $219,845
-
MMBtu
- -
02 2.2121: Increase amount of condensate returned $111,471 $70,939 - - - $80,019
-
MMBtu
- $31,452
-
Tgal
03 2.2511: Insulate bare equipment $35,700 $11,209 $34,032
539,339
kWh
- $1,668 - - -
04 2.2511: Insulate bare equipment $20,392 $3,960 - - - $20,392
-
MMBtu
- -
05 2.7111: Reduce illumination to minimum necessary levels $12,350 $720 $11,018
174,614
kWh
$755
-
kW-mo/yr
$577 - - -
06 3.4154: Eliminate leaks in water lines and valves $7,057 $1,330 - - - - - $7,057
-
Tgal
07 2.4231: Reduce the pressure of compressed air to the minimum required $5,368 $30 $5,117
81,097
kWh
- $251 - - -
08 2.7135: Install occupancy sensors $2,768 $210 $2,639
41,829
kWh
- $129 - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,347 $640 $2,237
35,450
kWh
- $110 - - -
10 2.7134: Use photocell controls $870 $90 $829
13,137
kWh
- $41 - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $785 $700 $315
4,993
kWh
- $15 - $455 -
TOTAL RECOMMENDED $418,953 $92,728 $56,187
890,459
kWh
$755
-
kW-mo/yr
$2,791 $320,256
-
MMBtu
$455 $38,509
-
Tgal
TOTAL IMPLEMENTED $398,467 $91,768 $37,413
592,919
kWh
- $1,834 $320,256
-
MMBtu
$455 $38,509
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs