ITAC Assessment: ME0251
ITAC logo
ITAC Assessment: ME0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product icecream
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $1
M
to 5
M
# of Employees 200
Plant Area 33,460
ft2
Annual Production 4,500
Tgal
Production Hrs. Annual 7,200
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,954 6,065,944
kWh
Electricity Demand $198,892 14,499
kW-mo/yr
Electricity Fees $(-547.0) -
LPG $6,115 1,020
MMBtu
Fuel Oil #2 $25,215 4,714
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $168,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $166,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $2,487 $600 $2,487
16,706
kWh
- - - - -
02 4.652: Replace existing equipment with more suitable substitutes $1,440 - - - - - - $1,440
03 2.2437: Recover waste heat from equipment $1,240 $2,100 $1,240
14,947
kWh
- - - - -
04 2.1113: Reduce combustion air flow to optimum $1,020 $400 - $1,020
-
MMBtu
- - - -
05 2.8121: Apply for tax-free status for energy purchases $448 - - - - $448 - -
06 4.131: Modify process to reduce material use/cost $160,875 $31,200 - - $6,435
-
lb
- $154,440 -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $1,200 $1,850 - - $1,200
-
lb
- - -
TOTAL RECOMMENDED $168,710 $36,150 $3,727
31,653
kWh
$1,020
-
MMBtu
$7,635
-
lb
$448 $154,440 $1,440
TOTAL IMPLEMENTED $166,070 $34,300 $3,727
31,653
kWh
$1,020
-
MMBtu
$6,435
-
lb
$448 $154,440 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs