ITAC Assessment: SD0042
ITAC logo
ITAC Assessment: SD0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product LAMINATED PLATES, SHEETS
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 16,500
thousand feet
Production Hrs. Annual 6,630
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $719,014 7,957,210
kWh
Natural Gas $412,388 147,507
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $718 $925 $718
7,913
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,484 $1,484 $1,484
16,413
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,759 $20 $2,759
30,481
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,264 $10,000 $16,437
182,005
kWh
$(-2,173.0)
-
MMBtu
-
05 2.2414: Use waste heat from hot flue gases to preheat $5,580 - - $5,580
-
MMBtu
-
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $40 $39 - $40
-
MMBtu
-
07 2.7243: Improve air circulation with destratification fans / other methods $803 $650 $803
8,499
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $10,457 - $9,844
109,027
kWh
- $613
09 2.7144: Install spectral reflectors / delamp $10,717 $11,800 $9,375
103,751
kWh
- $1,342
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,753 $2,420 $500
5,569
kWh
- $1,253
TOTAL RECOMMENDED $48,575 $27,338 $41,920
463,658
kWh
$3,447
-
MMBtu
$3,208
TOTAL IMPLEMENTED $16,530 $4,054 $14,624
161,489
kWh
$40
-
MMBtu
$1,866
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs