Assessment Year | 1993 |
---|---|
Principal Product | LAMINATED PLATES, SHEETS |
NAICS |
n/a
|
SIC | 3083: Laminated Plastics Plate, Sheet, and Profile Shapes |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 16,500
thousand feet
|
Production Hrs. Annual | 6,630
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $719,014 | 7,957,210 |
kWh
|
$0.090 |
Natural Gas | $412,388 | 147,507 |
MMBtu
|
$2.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,575 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,530 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $718 | $925 |
$718
7,913
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,484 | $1,484 |
$1,484
16,413
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,759 | $20 |
$2,759
30,481
kWh
|
- | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $14,264 | $10,000 |
$16,437
182,005
kWh
|
$(-2,173.0)
-
MMBtu
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $5,580 | - | - |
$5,580
-
MMBtu
|
- | |
06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $40 | $39 | - |
$40
-
MMBtu
|
- | |
07 | 2.7243: Improve air circulation with destratification fans / other methods | $803 | $650 |
$803
8,499
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,457 | - |
$9,844
109,027
kWh
|
- | $613 | |
09 | 2.7144: Install spectral reflectors / delamp | $10,717 | $11,800 |
$9,375
103,751
kWh
|
- | $1,342 | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,753 | $2,420 |
$500
5,569
kWh
|
- | $1,253 | |
TOTAL RECOMMENDED | $48,575 | $27,338 |
$41,920
463,658
kWh
|
$3,447
-
MMBtu
|
$3,208 | ||
TOTAL IMPLEMENTED | $16,530 | $4,054 |
$14,624
161,489
kWh
|
$40
-
MMBtu
|
$1,866 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs