Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,066

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0342 #07 Y:2006 Operate boilers on high fire setting $41,893 $112,000
WV0342 #06 Y:2006 Direct warmest air to combustion intake $74,909 $77,050
WV0342 #05 Y:2006 Preheat combustion air with waste heat $76,391 $42,250
WV0342 #04 Y:2006 Reduce excessive boiler blowdown $87,693 $208,500
WV0342 #03 Y:2006 Increase amount of condensate returned $103,142 $100,000
WV0342 #02 Y:2006 Use / purchase optimum sized compressor $124,707 $188,500
WV0342 #01 Y:2006 Repair or replace steam traps $151,419 $4,500
LL0248 #08 Y:2006 Install timers and/or thermostats $320 $50
LL0248 #07 Y:2006 Utilize higher efficiency lamps and/or ballasts $619 $150
LL0248 #06 Y:2006 Replace existing equipment with more suitable substitutes $900 $300
LL0248 #05 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $959 $151
LL0248 #04 Y:2006 Reduce the pressure of compressed air to the minimum required $1,082 $20
LL0248 #03 Y:2006 Begin a practice of predictive / preventative maintenance $1,218 $80
LL0248 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $10,463 $1,022
LL0248 #01 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $21,816 $14,656
OR0499 #10 Y:2006 Optimize plant power factor $2,460 $8,200
OR0499 #09 Y:2006 Upgrade controls on compressors $6,400 $19,000
OR0499 #08 Y:2006 Install occupancy sensors $2,950 $4,600
OR0499 #07 Y:2006 Reduce the pressure of compressed air to the minimum required $5,700 $5,700
OR0499 #06 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $12,700 $12,700