ITAC Assessment: OR0499
ITAC logo
ITAC Assessment: OR0499
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Bread and Buns
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 230,000
ft2
Annual Production 27,903
ton
Production Hrs. Annual 7,332
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,920 5,696,484
kWh
Electricity Demand $51,489 10,409
kW-mo/yr
Electricity Fees $22,522 -
Natural Gas $371,631 48,897
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $154,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $151,593

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
01 2.1113: Reduce combustion air flow to optimum $77,273 $12,000 - - - $77,273
-
MMBtu
- - -
02 4.125: $30,000 $18,000 - - - - - $(-2,400.0) $32,400
03 3.6192: Use a less expensive method of waste removal $5,200 - - - - - $5,200
-
lb
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $4,900 $570 - - - $4,900
-
MMBtu
- - -
05 2.4133: Use most efficient type of electric motors $6,960 $3,700 $5,920
107,000
kWh
$1,040
-
kW-mo/yr
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,700 $12,700 $11,100
201,000
kWh
$1,600
-
kW-mo/yr
- - - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $5,700 $5,700 $5,000
90,000
kWh
$700
-
kW-mo/yr
- - - - -
08 2.7135: Install occupancy sensors $2,950 $4,600 $2,100
38,000
kWh
$850
-
kW-mo/yr
- - - - -
09 2.4224: Upgrade controls on compressors $6,400 $19,000 $6,400
115,000
kWh
- - - - - -
10 2.3212: Optimize plant power factor $2,460 $8,200 - - $2,460 - - - -
TOTAL RECOMMENDED $154,543 $84,470 $30,520
551,000
kWh
$4,190
-
kW-mo/yr
$2,460 $82,173
-
MMBtu
$5,200
-
lb
$(-2,400.0) $32,400
TOTAL IMPLEMENTED $151,593 $79,870 $28,420
513,000
kWh
$3,340
-
kW-mo/yr
$2,460 $82,173
-
MMBtu
$5,200
-
lb
$(-2,400.0) $32,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs