Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

97

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2417 #06 Y:2024 Lower temperature during the winter season and vice-versa $1,329 -
UC2417 #05 Y:2024 Insulate bare equipment $5,554 $1,050
UC2417 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $1,301 $75
UC2417 #03 Y:2024 Replace existing hvac unit with high efficiency model $1,989 $7,146
UC2417 #02 Y:2024 Optimize plant power factor $2,644 $9,173
UC2417 #01 Y:2024 Pay utility bills on time $888 -
MA0841 #06 Y:2022 Install occupancy sensors $253 $234
MA0841 #05 Y:2022 Use heat pump for space conditioning $2,033 $7,500
MA0841 #04 Y:2022 Apply for tax-free status for energy purchases $5,842 $500
MA0841 #03 Y:2022 Ventilation system to shut off when room is not in use $9,761 $49,341
MA0841 #02 Y:2022 Use solar heat to make electricty $24,631 $155,407
MA0841 #01 Y:2022 Meter recycled water (to reduce sewer charges) $11,138 $8,830
MA0809 #06 Y:2019 Utilize higher efficiency lamps and/or ballasts $1,036 $3,057
MA0809 #05 Y:2019 Eliminate or reduce compressed air usage $1,114 $4,500
MA0809 #04 Y:2019 Reduce the pressure of compressed air to the minimum required $1,772 $1,000
MA0809 #03 Y:2019 Turn off equipment when not in use $2,332 $150
MA0809 #02 Y:2019 Replace electrically-operated equipment with fossil fuel equipment $2,745 $11,800
MA0809 #01 Y:2019 Use solar heat to make electricty $7,376 $23,715
MA0788 #07 Y:2018 Use computer programs to optimize hvac performance $4,043 $18,200
MA0788 #06 Y:2018 Install / repair insulation on steam lines $3,493 $1,750