ITAC Assessment: MA0788
ITAC logo
ITAC Assessment: MA0788
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Soup
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 110
Plant Area 110,000
ft2
Annual Production 2,027
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,231,502 9,113,000
kWh
Electricity Demand $99,219 18,096
kW-mo/yr
Natural Gas $912,567 64,000
MMBtu
TOTAL YEARLY COSTS $2,243,288
RECOMMENDED SAVINGS* $192,785 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $149,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $98,644 $110,000 $98,644
730,696
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $43,627 $17,006 $41,330
306,144
kWh
$2,297
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,698 $116,889 $31,698
234,802
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,164 $6,660 $7,164
53,070
kWh
- -
05 2.2511: Insulate bare equipment $4,116 $10,462 $4,116
30,493
kWh
- -
06 2.2136: Install / repair insulation on steam lines $3,493 $1,750 - - $3,493
-
MMBtu
07 2.7226: Use computer programs to optimize hvac performance $4,043 $18,200 $4,043
29,945
kWh
- -
TOTAL RECOMMENDED $192,785 $280,967 $186,995
1,385,150
kWh
$2,297
-
kW-mo/yr
$3,493
-
MMBtu
TOTAL IMPLEMENTED $149,880 $139,218 $144,090
1,067,333
kWh
$2,297
-
kW-mo/yr
$3,493
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs