Assessment Year | 2004 |
---|---|
Principal Product | Mechanical Seals |
NAICS | 339991: Gasket, Packing, and Sealing Device Manufacturing |
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $5 M to 10M |
# of Employees | 85 |
Plant Area |
35,000
ft2
|
Annual Production | 30,000
pieces
|
Production Hrs. Annual | 7,350
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $216,605 | 2,020,491 |
kWh
|
$0.11 |
Electricity Demand | $33,477 | 4,636 |
kW-mo/yr
|
$7.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,996 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,996 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,900 | - |
$2,900
27,105
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,815 | $250 |
$2,569
24,002
kWh
|
$246
-
kW-mo/yr
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,353 | $1,650 |
$2,353
21,994
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,013 | $20,872 |
$11,721
109,544
kWh
|
$1,292
-
kW-mo/yr
|
|
05 | 2.7131: Add area lighting switches | $11,915 | $500 |
$11,915
111,356
kWh
|
- | |
TOTAL RECOMMENDED | $32,996 | $23,272 |
$31,458
294,001
kWh
|
$1,538
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $32,996 | $23,272 |
$31,458
294,001
kWh
|
$1,538
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs