Assessment Year | 2006 |
---|---|
Principal Product | Commercial Laundry Equipment |
NAICS | 333318: Other Commercial and Service Industry Machinery Manufacturing |
SIC | 3582: Commercial Laundry, Drycleaning, and Pressing Machines |
Sales Range | $10 M to 50M |
# of Employees | 91 |
Plant Area |
63,600
ft2
|
Annual Production | 300
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $76,162 | 752,236 |
kWh
|
$0.10 |
Electricity Demand | $38,632 | 2,581 |
kW-mo/yr
|
$14.97 |
Electricity Fees | $4,346 | - |
|
- |
Natural Gas | $62,336 | 5,139 |
MMBtu
|
$12.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,718 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,638 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,985 | - |
$817
8,093
kWh
|
$1,168
-
kW-mo/yr
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $19 | - |
$4
44
kWh
|
$15
-
kW-mo/yr
|
- | - | |
03 | 3.2121: Convert to electrostatic powder coating | $15,419 | $4,500 | - | - | - | $15,419 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $765 | $201 |
$406
4,020
kWh
|
$359
-
kW-mo/yr
|
- | - | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $5,054 | $2,928 |
$(-330.0)
(-3,266)
kWh
|
$(-75.0)
-
kW-mo/yr
|
$5,459
-
MMBtu
|
- | |
06 | 2.7135: Install occupancy sensors | $290 | $239 |
$290
2,869
kWh
|
- | - | - | |
07 | 2.6211: Conserve energy by efficient use of vending machines | $602 | $712 |
$602
5,957
kWh
|
- | - | - | |
08 | 2.7496: Install partitions to reduce size of conditioned space | $10,784 | $19,571 | - | - |
$10,784
-
MMBtu
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,800 | $24,622 |
$1,707
16,898
kWh
|
$1,093
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $37,718 | $52,773 |
$3,496
34,615
kWh
|
$2,560
-
kW-mo/yr
|
$16,243
-
MMBtu
|
$15,419 | ||
TOTAL IMPLEMENTED | $8,638 | $27,751 |
$1,787
17,696
kWh
|
$1,392
-
kW-mo/yr
|
$5,459
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs