10,268
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AM1003 #08 Y:2026 | 08 | 2026 | Use solar heat to make electricty | $101,130 | $815,980 |
n/a
|
| AM1003 #07 Y:2026 | 07 | 2026 | Turn off equipment when not in use | $8,900 | $540 |
n/a
|
| AM1003 #06 Y:2026 | 06 | 2026 | Reduce the pressure of compressed air to the minimum required | $971 | $9 |
n/a
|
| AM1003 #05 Y:2026 | 05 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,946 | $1,830 |
n/a
|
| AM1003 #04 Y:2026 | 04 | 2026 | Eliminate or reduce compressed air usage | $360 | $425 |
n/a
|
| AM1003 #03 Y:2026 | 03 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $761 | $545 |
n/a
|
| AM1003 #02 Y:2026 | 02 | 2026 | Meter recycled water (to reduce sewer charges) | $40,935 | - |
n/a
|
| AM1003 #01 Y:2026 | 01 | 2026 | Optimize plant power factor | $5,740 | $10,270 |
n/a
|
| UL2614 #08 Y:2026 | 08 | 2026 | Eliminate or reduce compressed air usage | $474 | $403 |
n/a
|
| UL2614 #07 Y:2026 | 07 | 2026 | Use waste heat from hot flue gases to preheat | $9,873 | $32,500 |
n/a
|
| UL2614 #06 Y:2026 | 06 | 2026 | Use solar heat to make electricty | $15,745 | $220,724 |
n/a
|
| UL2614 #05 Y:2026 | 05 | 2026 | Optimize plant power factor | $3,431 | $7,370 |
n/a
|
| UL2614 #04 Y:2026 | 04 | 2026 | Install / repair insulation on steam lines | $2,638 | $2,392 |
n/a
|
| UL2614 #03 Y:2026 | 03 | 2026 | Use outside cold water source as a supply of cooling water | $13,075 | $57,069 |
n/a
|
| UL2614 #02 Y:2026 | 02 | 2026 | Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $569 | $350 |
n/a
|
| UL2614 #01 Y:2026 | 01 | 2026 | Utilize higher efficiency lamps and/or ballasts | $292 | $91 |
n/a
|
| SJ0055 #06 Y:2026 | 06 | 2026 | User battery storage for power quality issues | $1 | - |
n/a
|
| SJ0055 #05 Y:2026 | 05 | 2026 | Combine utility meters | $2,104 | - |
n/a
|
| SJ0055 #04 Y:2026 | 04 | 2026 | Use solar heat to make electricty | $105,896 | $509,829 |
n/a
|
| SJ0055 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $989 | $7,310 |
n/a
|