Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,268

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM1003 #08 Y:2026 Use solar heat to make electricty $101,130 $815,980
AM1003 #07 Y:2026 Turn off equipment when not in use $8,900 $540
AM1003 #06 Y:2026 Reduce the pressure of compressed air to the minimum required $971 $9
AM1003 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,946 $1,830
AM1003 #04 Y:2026 Eliminate or reduce compressed air usage $360 $425
AM1003 #03 Y:2026 Utilize energy-efficient belts and other improved mechanisms $761 $545
AM1003 #02 Y:2026 Meter recycled water (to reduce sewer charges) $40,935 -
AM1003 #01 Y:2026 Optimize plant power factor $5,740 $10,270
UL2614 #08 Y:2026 Eliminate or reduce compressed air usage $474 $403
UL2614 #07 Y:2026 Use waste heat from hot flue gases to preheat $9,873 $32,500
UL2614 #06 Y:2026 Use solar heat to make electricty $15,745 $220,724
UL2614 #05 Y:2026 Optimize plant power factor $3,431 $7,370
UL2614 #04 Y:2026 Install / repair insulation on steam lines $2,638 $2,392
UL2614 #03 Y:2026 Use outside cold water source as a supply of cooling water $13,075 $57,069
UL2614 #02 Y:2026 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $569 $350
UL2614 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $292 $91
SJ0055 #06 Y:2026 User battery storage for power quality issues $1 -
SJ0055 #05 Y:2026 Combine utility meters $2,104 -
SJ0055 #04 Y:2026 Use solar heat to make electricty $105,896 $509,829
SJ0055 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $989 $7,310