9,795
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
DL0259 #05 Y:2025 | 05 | 2025 | Use heat in flue gases to preheat products or materials | $10,050 | $40,000 |
n/a
|
DL0259 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,217 | $5,500 |
n/a
|
DL0259 #03 Y:2025 | 03 | 2025 | Use heat from boiler blowdown to preheat boiler feed water | $3,091 | $13,000 |
n/a
|
DL0259 #02 Y:2025 | 02 | 2025 | Recover waste heat from equipment | $11,620 | $30,000 |
n/a
|
DL0259 #01 Y:2025 | 01 | 2025 | Change procedures / equipment / operating conditions | $45,458 | $19,000 |
n/a
|
UD1111 #07 Y:2025 | 07 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $690 | $953 |
n/a
|
UD1111 #06 Y:2025 | 06 | 2025 | Install compressor air intakes in coolest locations | $1,406 | $2,030 |
n/a
|
UD1111 #05 Y:2025 | 05 | 2025 | Meter recycled water (to reduce sewer charges) | $1,836 | $2,500 |
n/a
|
UD1111 #04 Y:2025 | 04 | 2025 | Install occupancy sensors | $621 | $782 |
n/a
|
UD1111 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $10,758 | $10,506 |
n/a
|
UD1111 #02 Y:2025 | 02 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $216 | - |
n/a
|
UD1111 #01 Y:2025 | 01 | 2025 | Use flow control valves on equipment to optimize water use | $38,544 | $2,352 |
n/a
|
LS2511 #08 Y:2025 | 08 | 2025 | Use solar heat to make electricty | $35,809 | $231,660 |
n/a
|
LS2511 #07 Y:2025 | 07 | 2025 | Insulate bare equipment | $2,489 | $10,000 |
n/a
|
LS2511 #06 Y:2025 | 06 | 2025 | Use / purchase optimum sized compressor | $4,879 | $15,000 |
n/a
|
LS2511 #05 Y:2025 | 05 | 2025 | Use / purchase optimum sized compressor | $1,354 | $2,700 |
n/a
|
LS2511 #04 Y:2025 | 04 | 2025 | Replace existing equipment with more suitable substitutes | $31,553 | $60,000 |
n/a
|
LS2511 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $4,592 | $2,900 |
n/a
|
LS2511 #02 Y:2025 | 02 | 2025 | Clean and maintain refrigerant condensers and towers | $1,062 | $288 |
n/a
|
LS2511 #01 Y:2025 | 01 | 2025 | Install occupancy sensors | $2,926 | $250 |
n/a
|