Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,703

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0264 #11 Y:2024 Replace fossil fuel equipment with electrical equipment $44,506 $432,000
UU0264 #10 Y:2024 Utilize energy-efficient belts and other improved mechanisms $515 $916
UU0264 #09 Y:2024 Use solar heat to make electricty $44,517 $717,537
UU0264 #08 Y:2024 Install occupancy sensors $538 $1,531
UU0264 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,405 $8,915
UU0264 #06 Y:2024 Eliminate or reduce compressed air usage $1,905 $7,317
UU0264 #05 Y:2024 Upgrade controls on compressors $3,332 $4,000
UU0264 #04 Y:2024 Replace boiler $379,077 $4,080,441
UU0264 #03 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $729,671 $3,645,455
UU0264 #02 Y:2024 Preheat boiler makeup water with waste process heat $215,672 $730,950
UU0264 #01 Y:2024 Install automatic boiler fuel feed system $79,422 $143,652
UC2417 #06 Y:2024 Lower temperature during the winter season and vice-versa $1,329 -
UC2417 #05 Y:2024 Insulate bare equipment $5,554 $1,800
UC2417 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $1,301 $75
UC2417 #03 Y:2024 Replace existing hvac unit with high efficiency model $1,989 $7,146
UC2417 #02 Y:2024 Optimize plant power factor $2,644 $9,173
UC2417 #01 Y:2024 Pay utility bills on time $888 -
WM0231 #06 Y:2024 Utilize energy-efficient belts and other improved mechanisms $952 $900
WM0231 #05 Y:2024 Replace boiler $1,068 $1,150
WM0231 #04 Y:2024 Reduce space conditioning during non-working hours $2,105 -