Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,795

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0259 #05 Y:2025 Use heat in flue gases to preheat products or materials $10,050 $40,000
DL0259 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,217 $5,500
DL0259 #03 Y:2025 Use heat from boiler blowdown to preheat boiler feed water $3,091 $13,000
DL0259 #02 Y:2025 Recover waste heat from equipment $11,620 $30,000
DL0259 #01 Y:2025 Change procedures / equipment / operating conditions $45,458 $19,000
UD1111 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $690 $953
UD1111 #06 Y:2025 Install compressor air intakes in coolest locations $1,406 $2,030
UD1111 #05 Y:2025 Meter recycled water (to reduce sewer charges) $1,836 $2,500
UD1111 #04 Y:2025 Install occupancy sensors $621 $782
UD1111 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $10,758 $10,506
UD1111 #02 Y:2025 Utilize energy-efficient belts and other improved mechanisms $216 -
UD1111 #01 Y:2025 Use flow control valves on equipment to optimize water use $38,544 $2,352
LS2511 #08 Y:2025 Use solar heat to make electricty $35,809 $231,660
LS2511 #07 Y:2025 Insulate bare equipment $2,489 $10,000
LS2511 #06 Y:2025 Use / purchase optimum sized compressor $4,879 $15,000
LS2511 #05 Y:2025 Use / purchase optimum sized compressor $1,354 $2,700
LS2511 #04 Y:2025 Replace existing equipment with more suitable substitutes $31,553 $60,000
LS2511 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,592 $2,900
LS2511 #02 Y:2025 Clean and maintain refrigerant condensers and towers $1,062 $288
LS2511 #01 Y:2025 Install occupancy sensors $2,926 $250