25
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Structural steel and precast concrete contractors | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
OK0845 #09 Y:2012 | 09 | 2012 | Optimize plant power factor | $2,148 | $7,526 | |
OK0845 #08 Y:2012 | 08 | 2012 | Use radiant heater for spot heating | $20,678 | $90,000 | |
OK0845 #07 Y:2012 | 07 | 2012 | Recover waste heat from equipment | $1,780 | $1,378 | |
OK0845 #06 Y:2012 | 06 | 2012 | Use or replace with energy efficient substitutes | $318 | $1,584 | |
OK0845 #05 Y:2012 | 05 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,941 | $550 | |
OK0845 #04 Y:2012 | 04 | 2012 | Reduce the pressure of compressed air to the minimum required | $1,058 | - | |
OK0845 #03 Y:2012 | 03 | 2012 | Make a practice of turning off lights when not needed | $2,271 | $3,608 | |
OK0845 #02 Y:2012 | 02 | 2012 | Install occupancy sensors | $90 | $366 | |
OK0845 #01 Y:2012 | 01 | 2012 | Utilize higher efficiency lamps and/or ballasts | $2,354 | $12,299 | |
WV0391 #10 Y:2009 | 10 | 2009 | Install compressor air intakes in coolest locations | $374 | $300 | |
WV0391 #09 Y:2009 | 09 | 2009 | Establish a predictive maintenance program | $2,609 | $1,000 | |
WV0391 #08 Y:2009 | 08 | 2009 | Develop a repair/replace policy | $2,651 | $605 | |
WV0391 #07 Y:2009 | 07 | 2009 | Install / repair insulation on steam lines | $3,782 | $8,543 | |
WV0391 #06 Y:2009 | 06 | 2009 | Reduce the pressure of compressed air to the minimum required | $4,483 | $105 | |
WV0391 #05 Y:2009 | 05 | 2009 | Use adjustable frequency drive or multiple speed motors on existing system | $4,896 | $8,900 | |
WV0391 #04 Y:2009 | 04 | 2009 | Eliminate or reduce compressed air usage | $9,238 | $8,890 | |
WV0391 #03 Y:2009 | 03 | 2009 | Analyze flue gas for proper air/fuel ratio | $11,520 | $800 | |
WV0391 #02 Y:2009 | 02 | 2009 | Use photocell controls | $11,811 | $6,850 | |
WV0391 #01 Y:2009 | 01 | 2009 | Use waste heat from hot flue gases to preheat | $27,893 | $26,000 | |
NC0278 #06 Y:2003 | 06 | 2003 | Use photocell controls | $72 | $130 |