ITAC Assessment: WV0391
ITAC logo
ITAC Assessment: WV0391
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Precast Concrete
NAICS 238120: Structural Steel and Precast Concrete Contractors
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 189,154
ft2
Annual Production 93,400
units
Production Hrs. Annual 5,060
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,840 3,256,768
kWh
Electricity Demand $69,805 8,854
kW-mo/yr
Electricity Fees $567 -
Natural Gas $353,514 26,363
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,257 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,637

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $27,893 $26,000 - - $27,893
-
MMBtu
-
02 2.7134: Use photocell controls $11,811 $6,850 $8,155
195,518
kWh
$3,656
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $11,520 $800 - - $11,573
-
MMBtu
$(-53.0)
04 2.4239: Eliminate or reduce compressed air usage $9,238 $8,890 $6,378
152,901
kWh
$2,860
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,896 $8,900 $3,383
81,114
kWh
$1,513
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,483 $105 $3,096
74,226
kWh
$1,387
-
kW-mo/yr
- -
07 2.2136: Install / repair insulation on steam lines $3,782 $8,543 - - $3,782
-
MMBtu
-
08 2.4151: Develop a repair/replace policy $2,651 $605 $1,978
47,412
kWh
$883
-
kW-mo/yr
- $(-210.0)
09 2.4157: Establish a predictive maintenance program $2,609 $1,000 $1,898
45,516
kWh
$851
-
kW-mo/yr
- $(-140.0)
10 2.4221: Install compressor air intakes in coolest locations $374 $300 $215
5,154
kWh
$159
-
kW-mo/yr
- -
TOTAL RECOMMENDED $79,257 $61,993 $25,103
601,841
kWh
$11,309
-
kW-mo/yr
$43,248
-
MMBtu
$(-403.0)
TOTAL IMPLEMENTED $21,637 $2,810 $7,187
172,308
kWh
$3,280
-
kW-mo/yr
$11,573
-
MMBtu
$(-403.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs