Assessment Year | 2018 |
---|---|
Principal Product | Thermoset Plastics |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
111,000
ft2
|
Annual Production | 10,000
units
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $582,703 | 6,236,100 |
kWh
|
$0.093 | |
Electricity Demand | $76,289 | 12,082 |
kW-mo/yr
|
$6.31 | |
Electricity Fees | $18,793 | - |
|
- | |
Natural Gas | $26,684 | 3,273 |
MMBtu
|
$8.15 | |
Waste Disposal Costs | |||||
Water Usage | $10,306 | 1,535 |
Tgal
|
$6.71 | |
Water Disposal | $10,055 | 1,535 |
Tgal
|
$6.55 | |
TOTAL YEARLY COSTS | $724,830 | ||||
RECOMMENDED SAVINGS* | $82,668 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $14,412 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $64,590 | $114,000 |
$64,590
669,326
kWh
|
- | - | - | - | - | - | |
02 | 2.4151: Develop a repair/replace policy | $4,621 | $945 |
$4,616
47,833
kWh
|
$505
-
kW-mo/yr
|
- | - | - | - | $(-500.0) | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,255 | $600 |
$3,255
33,731
kWh
|
- | - | - | - | - | - | |
04 | 2.3191: Use demand controller or load shedder | $3,029 | $500 | - |
$3,029
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,643 | $5,200 |
$2,643
27,387
kWh
|
- | - | - | - | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $1,581 | $575 |
$1,423
14,742
kWh
|
$158
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 3.4151: Minimize water usage | $1,217 | $3,150 | - | - | - |
$725
-
Tgal
|
$707
-
Tgal
|
$(-215.0) | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,023 | $500 |
$1,023
10,598
kWh
|
- | - | - | - | - | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $595 | $50 |
$538
5,574
kWh
|
$57
-
kW-mo/yr
|
- | - | - | - | - | |
10 | 2.2511: Insulate bare equipment | $114 | $180 | - | - |
$114
-
MMBtu
|
- | - | - | - | |
TOTAL RECOMMENDED | $82,668 | $125,700 |
$78,088
809,191
kWh
|
$3,749
-
kW-mo/yr
|
$114
-
MMBtu
|
$725
-
Tgal
|
$707
-
Tgal
|
$(-215.0) | $(-500.0) | ||
TOTAL IMPLEMENTED | $14,412 | $6,000 |
$9,832
101,880
kWh
|
$3,749
-
kW-mo/yr
|
$114
-
MMBtu
|
$725
-
Tgal
|
$707
-
Tgal
|
$(-215.0) | $(-500.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs