ITAC Assessment: UM0167
ITAC logo
ITAC Assessment: UM0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Titanium tubing
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $5
M
to 10
M
# of Employees 86
Plant Area 109,000
ft2
Annual Production 620
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,706 2,178,488
kWh
Electricity Demand $80,561 4,248
kW-mo/yr
Electricity Fees $8,860 -
Natural Gas $69,583 18,956
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,177 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings
01 2.4133: Use most efficient type of electric motors $1,108 $4,665 $567
19,050
kWh
$541
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,795 $100 $926
31,360
kWh
$869
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,504 $825 $1,980
66,823
kWh
$1,524
-
kW-mo/yr
- - -
04 2.2437: Recover waste heat from equipment $1,167 $500 - - $1,167
-
MMBtu
- -
05 2.7243: Improve air circulation with destratification fans / other methods $20,700 $4,550 - - $20,700
-
MMBtu
- -
06 2.2511: Insulate bare equipment $6,118 $3,300 - - $6,118
-
MMBtu
- -
07 3.4111: Use closed cycle process to minimize waste water production $16,497 $1,000 - - - $16,497
-
Tgal
-
08 3.3122: Use filtration, centrifuging to remove contaminants $7,288 $11,000 - - - - $7,288
-
gal
TOTAL RECOMMENDED $58,177 $25,940 $3,473
117,233
kWh
$2,934
-
kW-mo/yr
$27,985
-
MMBtu
$16,497
-
Tgal
$7,288
-
gal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs