| Assessment Year | 2000 |
|---|---|
| Principal Product | Titanium tubing |
| NAICS |
n/a
|
| SIC | 3498: Fabricated Pipe and Pipe Fittings |
| Sales Range | $5 M to 10M |
| # of Employees | 86 |
| Plant Area |
109,000
ft2
|
| Annual Production | 620
thousand feet
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $68,706 | 2,178,488 |
kWh
|
$0.032 |
| Electricity Demand | $80,561 | 4,248 |
kW-mo/yr
|
$18.96 |
| Electricity Fees | $8,860 | - |
|
- |
| Natural Gas | $69,583 | 18,956 |
MMBtu
|
$3.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $58,177 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,108 | $4,665 |
$567
19,050
kWh
|
$541
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,795 | $100 |
$926
31,360
kWh
|
$869
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,504 | $825 |
$1,980
66,823
kWh
|
$1,524
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.2437: Recover waste heat from equipment | $1,167 | $500 | - | - |
$1,167
-
MMBtu
|
- | - | |
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $20,700 | $4,550 | - | - |
$20,700
-
MMBtu
|
- | - | |
| 06 | 2.2511: Insulate bare equipment | $6,118 | $3,300 | - | - |
$6,118
-
MMBtu
|
- | - | |
| 07 | 3.4111: Use closed cycle process to minimize waste water production | $16,497 | $1,000 | - | - | - |
$16,497
-
Tgal
|
- | |
| 08 | 3.3122: Use filtration, centrifuging to remove contaminants | $7,288 | $11,000 | - | - | - | - |
$7,288
-
gal
|
|
| TOTAL RECOMMENDED | $58,177 | $25,940 |
$3,473
117,233
kWh
|
$2,934
-
kW-mo/yr
|
$27,985
-
MMBtu
|
$16,497
-
Tgal
|
$7,288
-
gal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs