ITAC Assessment: OK0995
ITAC logo
ITAC Assessment: OK0995
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Machined and assembled aerospace components
NAICS 336411: Aircraft Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 206,500
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 4,576
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,531 3,762,067
kWh
Electricity Demand $298,708 13,553
kW-mo/yr
Natural Gas $46,132 7,489
MMBtu
TOTAL YEARLY COSTS $510,371
RECOMMENDED SAVINGS* $50,684 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,513

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $32,860 $45,285 - - $32,860 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,425 $19,203 $7,240
164,537
kWh
$7,185
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $1,644 $404 $705
16,016
kWh
$939
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $308 - $308
7,001
kWh
- - -
05 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $1,003 $2,512 $1,003
22,788
kWh
- - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $444 $300 - - - $444
-
MMBtu
TOTAL RECOMMENDED $50,684 $67,704 $9,256
210,342
kWh
$8,124
-
kW-mo/yr
$32,860 $444
-
MMBtu
TOTAL IMPLEMENTED $16,513 $19,907 $7,945
180,553
kWh
$8,124
-
kW-mo/yr
- $444
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs