ITAC Assessment: RU0094
ITAC logo
ITAC Assessment: RU0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ROOF TRUSSES
NAICS
n/a
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 103
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,143 1,024,912
kWh
Natural Gas $12,365 2,346
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,936 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,254

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,951 $80 $1,951
24,912
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $295 - $295
7,034
kWh
03 3.4151: Minimize water usage $387 $34 $387
4,689
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,303 - $3,303
40,739
kWh
TOTAL RECOMMENDED $5,936 $114 $5,936
77,374
kWh
TOTAL IMPLEMENTED $5,254 $80 $5,254
65,651
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs