Assessment Year | 2003 |
---|---|
Principal Product | Orthopedic appliances |
NAICS | 339113: Surgical Appliance and Supplies Manufacturing |
SIC | 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
60,000
ft2
|
Annual Production | 875,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,603 | 800,320 |
kWh
|
$0.068 |
Electricity Fees | $3,410 | - |
|
- |
Natural Gas | $4,864 | 898 |
MMBtu
|
$5.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $243,061 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $6,206 | $744 | - |
$6,206
-
MMBtu
|
- | - | |
02 | 2.7241: Install outside air damper / economizer on hvac unit | $1,461 | $5,880 |
$1,461
22,474
kWh
|
- | - | - | |
03 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $1,131 | - |
$1,786
27,475
kWh
|
- | $605 | $(-1,260.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $487 | $640 |
$420
6,458
kWh
|
- | $67 | - | |
05 | 2.7135: Install occupancy sensors | $336 | $349 |
$336
5,171
kWh
|
- | - | - | |
06 | 4.431: Train operators for maximum operating efficiency | $232,400 | $2,844 | - | - | $232,400 | - | |
07 | 4.425: Eliminate/reduce redundant inspections | $1,040 | $165 | - | - | $1,040 | - | |
TOTAL RECOMMENDED | $243,061 | $10,622 |
$4,003
61,578
kWh
|
$6,206
-
MMBtu
|
$234,112 | $(-1,260.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs