ITAC Assessment: OK0654
ITAC logo
ITAC Assessment: OK0654
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Orthopedic appliances
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 60,000
ft2
Annual Production 875,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,603 800,320
kWh
Electricity Fees $3,410 -
Natural Gas $4,864 898
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $243,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6232: Install set-back timers $6,206 $744 - $6,206
-
MMBtu
- -
02 2.7241: Install outside air damper / economizer on hvac unit $1,461 $5,880 $1,461
22,474
kWh
- - -
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $1,131 - $1,786
27,475
kWh
- $605 $(-1,260.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $487 $640 $420
6,458
kWh
- $67 -
05 2.7135: Install occupancy sensors $336 $349 $336
5,171
kWh
- - -
06 4.431: Train operators for maximum operating efficiency $232,400 $2,844 - - $232,400 -
07 4.425: Eliminate/reduce redundant inspections $1,040 $165 - - $1,040 -
TOTAL RECOMMENDED $243,061 $10,622 $4,003
61,578
kWh
$6,206
-
MMBtu
$234,112 $(-1,260.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs