ITAC Assessment: NC0278
ITAC logo
ITAC Assessment: NC0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product pre-cast concrete structures
NAICS 238120: Structural Steel and Precast Concrete Contractors
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 140,000
ft2
Annual Production 264,600,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,542 2,588,109
kWh
Electricity Demand $16,723 4,905
kW-mo/yr
Natural Gas $43,487 3,990
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,626 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4226: Use / purchase optimum sized compressor $4,343 $18,000 n/a $4,343
49,600
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $458 $1,750 $375
8,200
kWh
$83
-
kW-mo/yr
03 2.4239: Eliminate or reduce compressed air usage $47 $25 $37
801
kWh
$10
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,132 $630 $2,558
55,965
kWh
$574
-
kW-mo/yr
05 2.6218: Turn off equipment when not in use $574 $25 $574
15,120
kWh
-
06 2.7134: Use photocell controls $72 $130 $60
1,314
kWh
$12
-
kW-mo/yr
TOTAL RECOMMENDED $8,626 $20,560 $7,947
131,000
kWh
$679
-
kW-mo/yr
TOTAL IMPLEMENTED $693 $180 $671
17,235
kWh
$22
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs