Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

657

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Water supply and irrigation systems
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0633 #07 Y:2022 Establish a predictive maintenance program $1,011 $1,500
WV0633 #06 Y:2022 Level zero – install control systems for existing equipment $1,637 $5,130
WV0633 #05 Y:2022 Install occupancy sensors $2,533 $1,543
WV0633 #04 Y:2022 Level zero – install control systems for existing equipment $4,626 $4,080
WV0633 #03 Y:2022 Direct waste gasses to boiler combustion air $4,724 $12,236
WV0633 #02 Y:2022 Use or replace with energy efficient substitutes $13,775 $16,600
WV0633 #01 Y:2022 Change product design to reduce energy requirements $14,598 $23,000
WV0631 #06 Y:2022 Establish a predictive maintenance program $560 $1,500
WV0631 #05 Y:2022 Develop a repair/replace policy $1,092 $1,292
WV0631 #04 Y:2022 Upgrade controls on compressors $2,204 $1,911
WV0631 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $11,513 $4,998
WV0631 #02 Y:2022 Change product design to reduce energy requirements $22,924 $32,450
WV0631 #01 Y:2022 Use or replace with energy efficient substitutes $30,923 $89,840
WV0628 #07 Y:2022 Develop a repair/replace policy $371 $1,608
WV0628 #06 Y:2022 Upgrade controls on compressors $1,374 $6,454
WV0628 #05 Y:2022 Utilize higher efficiency lamps and/or ballasts $2,802 $3,626
WV0628 #04 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $7,819 $15,170
WV0628 #03 Y:2022 Establish a predictive maintenance program $8,049 $1,000
WV0628 #02 Y:2022 Use or replace with energy efficient substitutes $15,010 $73,174
WV0628 #01 Y:2022 Replace fossil fuel equipment with electrical equipment $31,838 $14,600