Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,413

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Water, sewage and other systems
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0089 #01 Y:2017 Reuse rich white water in other applications $21,884 $224
WV0552 #07 Y:2017 Utilize higher efficiency lamps and/or ballasts $2,913 $3,240
WV0552 #06 Y:2017 Utilize higher efficiency lamps and/or ballasts $3,201 $10,486
WV0552 #05 Y:2017 Establish a predictive maintenance program $9,424 $1,000
WV0552 #04 Y:2017 Develop a repair/replace policy $13,726 $620
WV0552 #03 Y:2017 Interlock heating and air conditioning systems to prevent simultaneous operation $14,015 $46,500
WV0552 #02 Y:2017 Use power during off-peak periods $17,322 $2,500
WV0552 #01 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $108,472 $401,920
MZ0232 #03 Y:2017 Reschedule plant operations or reduce load to avoid peaks $8,891 $10,000
MZ0232 #02 Y:2017 Eliminate leaks in water lines and valves $1,573 $6,000
MZ0232 #01 Y:2017 Use or replace with energy efficient substitutes $3,500 $25,000
UF0511 #06 Y:2017 Develop standard procedures to improve internal yields $495,807 $1,875,550
UF0511 #05 Y:2017 Analyze flue gas for proper air/fuel ratio $5,152 $2,800
UF0511 #04 Y:2017 Utilize controls to operate equipment only when needed $7,447 $20,214
UF0511 #03 Y:2017 Utilize higher efficiency lamps and/or ballasts $9,022 $14,000
UF0511 #02 Y:2017 Use waste heat from hot flue gases to preheat $200,909 $20,000
UF0511 #01 Y:2017 Install equipment to utilize waste fuel $5,783,172 $13,354,800
WM0109 #10 Y:2017 Meter recycled water (to reduce sewer charges) $394 -
WM0109 #09 Y:2017 Reduce space conditioning during non-working hours $803 -
WM0109 #08 Y:2017 Install compressor air intakes in coolest locations $817 $1,224