ITAC Assessment: WM0108
ITAC logo
ITAC Assessment: WM0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Treated wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 19
Plant Area 400,000
ft2
Annual Production 2,920,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,845 4,337,160
kWh
Electricity Demand $79,636 12,219
kW-mo/yr
Electricity Fees $47,042 -
Natural Gas $92,514 18,042
MMBtu
Waste Disposal Costs
Water Usage $27,265 2,275
Tgal
TOTAL YEARLY COSTS $464,302
RECOMMENDED SAVINGS* $23,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3134: Shift from daytime to nighttime operation $8,966 $6,300 - $5,756
-
kW-mo/yr
$3,210 -
02 2.7224: Reduce space conditioning during non-working hours $7,431 - - - - $7,431
-
MMBtu
03 2.4314: Use synthetic lubricant $4,603 $4,815 $3,697
72,555
kWh
$906
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,022 $4,500 $1,748
34,309
kWh
$274
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $778 $548 $661
12,973
kWh
$117
-
kW-mo/yr
- -
TOTAL RECOMMENDED $23,800 $16,163 $6,106
119,837
kWh
$7,053
-
kW-mo/yr
$3,210 $7,431
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs