ITAC Assessment: AM0073
ITAC logo
ITAC Assessment: AM0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ASPHALT ROOFING SHINGLES
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 1,080,000
pieces
Production Hrs. Annual 3,296
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,672 2,199,883
kWh
Natural Gas $200,898 60,541
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,483

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $7,510 - $7,510
-
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,170 $3,600 $4,890
78,839
kWh
- $280
03 2.2437: Recover waste heat from equipment $1,245 $1,100 - $1,245
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $703 $500 $703
25,205
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $514 - $514
18,464
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $260 $300 $260
9,379
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $100 $110 $100
1,758
kWh
- -
TOTAL RECOMMENDED $15,502 $5,610 $13,977
133,645
kWh
$1,245
-
MMBtu
$280
TOTAL IMPLEMENTED $13,483 $4,210 $13,203
105,802
kWh
- $280
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs