ITAC Assessment: NC0551
ITAC logo
ITAC Assessment: NC0551
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Carbon brushes
NAICS 335991: Carbon and Graphite Product Manufacturing
SIC 3624: Carbon and Graphite Products
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 66,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,564 8,209,152
kWh
Electricity Demand $204,975 16,611
kW-mo/yr
Natural Gas $103,897 21,584
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7313: Recycle air for heating, ventilation and air conditioning $25,598 $8,900 $4,352
106,939
kWh
- $21,246
-
MMBtu
02 2.4226: Use / purchase optimum sized compressor $6,494 $10,000 $6,494
206,800
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,002 $100 $577
14,174
kWh
$425
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $1,392 $6,000 $1,392
34,200
kWh
- -
05 2.2437: Recover waste heat from equipment $1,626 $2,505 - - $1,626
-
MMBtu
06 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $509 $900 $509
12,507
kWh
- -
07 2.4151: Develop a repair/replace policy $1,566 $4,256 $820
20,148
kWh
$746
-
kW-mo/yr
-
08 2.2437: Recover waste heat from equipment $8,783 $42,000 - - $8,783
-
MMBtu
TOTAL RECOMMENDED $46,970 $74,661 $14,144
394,768
kWh
$1,171
-
kW-mo/yr
$31,655
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs