Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,294

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Water, sewage and other systems
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0034 #04 Y:2025 Use power during off-peak periods $1,270 -
SJ0034 #03 Y:2025 Use optimum temperature $3,458 -
SJ0034 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $12,631 $10,962
SJ0034 #01 Y:2025 Use solar heat to make electricty $31,541 $106,228
NL0107 #04 Y:2025 Close holes and openings in building such as broken windows $109 $30
NL0107 #03 Y:2025 Replace electrically-operated equipment with fossil fuel equipment $1,532 $2,280
NL0107 #02 Y:2025 Use most efficient type of electric motors $21,036 $165,000
NL0107 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $23,651 $66,700
TR0062 #04 Y:2024 Install occupancy sensors $305 $357
TR0062 #03 Y:2024 Use most efficient type of electric motors $33,300 $300,000
TR0062 #02 Y:2024 Use most efficient type of electric motors $4,539 $75,000
TR0062 #01 Y:2024 Use solar heat to make electricty $80,582 $262,441
SJ0032 #06 Y:2024 Turn off equipment when not in use $123 -
SJ0032 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,156 $2,349
SJ0032 #04 Y:2024 Install an uninteruptable power supply $5,400 $34,907
SJ0032 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $869 -
SJ0032 #02 Y:2024 Insulate bare equipment $400 $297
SJ0032 #01 Y:2024 Install equipment to utilize waste fuel $129,492 $206,023
NL0103 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $110 $355
NL0103 #06 Y:2024 Install occupancy sensors $114 $428