Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,366

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Utilities
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2518 #03 Y:2025 Use solar heat to make electricty $36,278 $403,650
LS2518 #02 Y:2025 Level one – add communication using iiot devices to existing control system to modify operations $23,606 $141,000
LS2518 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $292 $510
MUWT07 #06 Y:2025 Install timers and/or thermostats $105 $38
MUWT07 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $29 $90
MUWT07 #04 Y:2025 Use photocell controls $454 $562
MUWT07 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $124 $8
MUWT07 #02 Y:2025 Install occupancy sensors $706 $432
MUWT07 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,429 $6,434
UU0276 #06 Y:2025 Utilize daylight whenever possible in lieu of artificial light $339 $990
UU0276 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $8,440 $14,700
UU0276 #04 Y:2025 Use solar heat to make electricty $28,400 $657,000
UU0276 #03 Y:2025 Modify startup/shutdown times $2,950 $3,600
UU0276 #02 Y:2025 Utilize controls to operate equipment only when needed $20,500 $110,000
UU0276 #01 Y:2025 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $30,600 $110,000
IC0328 #05 Y:2025 Use existing dam to generate electricity $6,679 $33,300
IC0328 #04 Y:2025 Install occupancy sensors $244 $694
IC0328 #03 Y:2025 Minimize operation of equipment maintained in standby condition $239 -
IC0328 #02 Y:2025 Use or replace with energy efficient substitutes $82,241 $385,393
IC0328 #01 Y:2025 Use or replace with energy efficient substitutes $101,072 $435,474