19
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | All other nonmetallic mineral mining | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SU0478 #07 Y:2019 | 07 | 2019 | Optimize plant power factor | $29,408 | $113,315 | |
SU0478 #06 Y:2019 | 06 | 2019 | Utilize higher efficiency lamps and/or ballasts | $8,321 | $75,548 | |
SU0478 #05 Y:2019 | 05 | 2019 | Install occupancy sensors | $1,130 | $1,973 | |
SU0478 #04 Y:2019 | 04 | 2019 | Utilize higher efficiency lamps and/or ballasts | $385 | $528 | |
SU0478 #03 Y:2019 | 03 | 2019 | Install compressor air intakes in coolest locations | $1,685 | $1,302 | |
SU0478 #02 Y:2019 | 02 | 2019 | Conserve energy by efficient use of vending machines | $468 | $253 | |
SU0478 #01 Y:2019 | 01 | 2019 | Use or replace with energy efficient substitutes | $2,670 | $260 | |
OK0957 #07 Y:2016 | 07 | 2016 | Use most efficient type of electric motors | $9,997 | $29,582 | |
OK0957 #06 Y:2016 | 06 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $18,059 | $52,806 | |
OK0957 #05 Y:2016 | 05 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $6,973 | $8,747 | |
OK0957 #04 Y:2016 | 04 | 2016 | Reduce the pressure of compressed air to the minimum required | $2,025 | - | |
OK0957 #03 Y:2016 | 03 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,710 | $2,100 | |
OK0957 #02 Y:2016 | 02 | 2016 | Utilize higher efficiency lamps and/or ballasts | $890 | $1,320 | |
OK0957 #01 Y:2016 | 01 | 2016 | Utilize higher efficiency lamps and/or ballasts | $1,200 | $2,994 | |
NC0355 #05 Y:2006 | 05 | 2006 | Reduce illumination to minimum necessary levels | $1,131 | $1,000 | |
NC0355 #04 Y:2006 | 04 | 2006 | Use / purchase optimum sized compressor | $16,252 | $20,000 | |
NC0355 #03 Y:2006 | 03 | 2006 | Reduce the pressure of compressed air to the minimum required | $10,340 | $30,000 | |
NC0355 #02 Y:2006 | 02 | 2006 | Re-use or recycle hot or cold process exhaust air | $235,435 | $78,000 | |
NC0355 #01 Y:2006 | 01 | 2006 | Recover waste heat from equipment | $362,261 | $136,000 |