ITAC Assessment: NC0355
ITAC logo
ITAC Assessment: NC0355
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Roofing granules
NAICS 212399: All Other Nonmetallic Mineral Mining
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $10
M
to 50
M
# of Employees 53
Plant Area 95,000
ft2
Annual Production 2,000,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $838,349 21,908,923
kWh
Electricity Demand $109,245 38,693
kW-mo/yr
Electricity Fees $323,268 -
Natural Gas $5,960,665 552,827
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $625,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $235,435

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.2437: Recover waste heat from equipment $362,261 $136,000 $(-6,066.0)
(-147,596)
kWh
$(-1,373.0)
-
kW-mo/yr
$361,642
-
MMBtu
$8,058
-
Tgal
02 2.2443: Re-use or recycle hot or cold process exhaust air $235,435 $78,000 - - $235,435
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $10,340 $30,000 $9,496
231,052
kWh
$844
-
kW-mo/yr
- -
04 2.4226: Use / purchase optimum sized compressor $16,252 $20,000 $14,121
343,571
kWh
$2,131
-
kW-mo/yr
- -
05 2.7111: Reduce illumination to minimum necessary levels $1,131 $1,000 $869
21,150
kWh
$262
-
kW-mo/yr
- -
TOTAL RECOMMENDED $625,419 $265,000 $18,420
448,177
kWh
$1,864
-
kW-mo/yr
$597,077
-
MMBtu
$8,058
-
Tgal
TOTAL IMPLEMENTED $235,435 $78,000 - - $235,435
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs