Assessment Year | 2006 |
---|---|
Principal Product | Roofing granules |
NAICS | 212399: All Other Nonmetallic Mineral Mining |
SIC | 3295: Minerals and Earths, Ground or Otherwise Treated |
Sales Range | $10 M to 50M |
# of Employees | 53 |
Plant Area |
95,000
ft2
|
Annual Production | 2,000,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $838,349 | 21,908,923 |
kWh
|
$0.038 |
Electricity Demand | $109,245 | 38,693 |
kW-mo/yr
|
$2.82 |
Electricity Fees | $323,268 | - |
|
- |
Natural Gas | $5,960,665 | 552,827 |
MMBtu
|
$10.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $625,419 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $235,435 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $362,261 | $136,000 |
$(-6,066.0)
(-147,596)
kWh
|
$(-1,373.0)
-
kW-mo/yr
|
$361,642
-
MMBtu
|
$8,058
-
Tgal
|
|
02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $235,435 | $78,000 | - | - |
$235,435
-
MMBtu
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,340 | $30,000 |
$9,496
231,052
kWh
|
$844
-
kW-mo/yr
|
- | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $16,252 | $20,000 |
$14,121
343,571
kWh
|
$2,131
-
kW-mo/yr
|
- | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $1,131 | $1,000 |
$869
21,150
kWh
|
$262
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $625,419 | $265,000 |
$18,420
448,177
kWh
|
$1,864
-
kW-mo/yr
|
$597,077
-
MMBtu
|
$8,058
-
Tgal
|
||
TOTAL IMPLEMENTED | $235,435 | $78,000 | - | - |
$235,435
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs