37
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SU0478 #07 Y:2019 | 07 | 2019 | Optimize plant power factor | $29,408 | $113,315 | |
SU0478 #06 Y:2019 | 06 | 2019 | Utilize higher efficiency lamps and/or ballasts | $8,321 | $75,548 | |
SU0478 #05 Y:2019 | 05 | 2019 | Install occupancy sensors | $1,130 | $1,973 | |
SU0478 #04 Y:2019 | 04 | 2019 | Utilize higher efficiency lamps and/or ballasts | $385 | $528 | |
SU0478 #03 Y:2019 | 03 | 2019 | Install compressor air intakes in coolest locations | $1,685 | $1,302 | |
SU0478 #02 Y:2019 | 02 | 2019 | Conserve energy by efficient use of vending machines | $468 | $253 | |
SU0478 #01 Y:2019 | 01 | 2019 | Use or replace with energy efficient substitutes | $2,670 | $260 | |
UU0148 #06 Y:2019 | 06 | 2019 | Utilize higher efficiency lamps and/or ballasts | $6,667 | $8,267 | |
UU0148 #05 Y:2019 | 05 | 2019 | Use computer programs to optimize hvac performance | $10,445 | $308 | |
UU0148 #04 Y:2019 | 04 | 2019 | Separate and recycle scrap metal to foundry or for sale | $21,723 | $100,000 | |
UU0148 #03 Y:2019 | 03 | 2019 | Size electric motors for peak operating efficiency | $205,559 | $25,240 | |
UU0148 #02 Y:2019 | 02 | 2019 | Reschedule plant operations or reduce load to avoid peaks | $292,277 | $82,400 | |
UU0148 #01 Y:2019 | 01 | 2019 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $4,526,086 | $11,242,113 | |
OK0957 #07 Y:2016 | 07 | 2016 | Use most efficient type of electric motors | $9,997 | $29,582 | |
OK0957 #06 Y:2016 | 06 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $18,059 | $52,806 | |
OK0957 #05 Y:2016 | 05 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $6,973 | $8,747 | |
OK0957 #04 Y:2016 | 04 | 2016 | Reduce the pressure of compressed air to the minimum required | $2,025 | - | |
OK0957 #03 Y:2016 | 03 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,710 | $2,100 | |
OK0957 #02 Y:2016 | 02 | 2016 | Utilize higher efficiency lamps and/or ballasts | $890 | $1,320 | |
OK0957 #01 Y:2016 | 01 | 2016 | Utilize higher efficiency lamps and/or ballasts | $1,200 | $2,994 |