| Assessment Year | 2019 |
|---|---|
| Principal Product | Phosphate slurry |
| NAICS | 212392: Phosphate Rock Mining |
| SIC | 1475: Phosphate Rock |
| Sales Range | $100 M to 500M |
| # of Employees | 160 |
| Plant Area |
50,000
ft2
|
| Annual Production | 1,530,000
ton
|
| Production Hrs. Annual | 8,160
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $2,397,205 | 75,191,029 |
kWh
|
$0.032 | |
| Electricity Demand | $1,704,672 | 126,084 |
kW-mo/yr
|
$13.52 | |
| Electricity Fees | $63,845 | - |
|
- | |
| Natural Gas | $26,112 | 3,264 |
MMBtu
|
$8.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $1,604,810 | 11,064,960 |
Tgal
|
$0.15 | |
| TOTAL YEARLY COSTS | $5,796,645 | ||||
| RECOMMENDED SAVINGS* | $5,062,757 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $504,504 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $4,526,086 | $11,242,113 |
$1,171,368
36,720,000
kWh
|
$741,656
-
kW-mo/yr
|
$(-1,139,722.0)
-
MMBtu
|
- | - | - | $3,752,784 | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $292,277 | $82,400 |
$149,916
-
kWh
|
$142,361
-
kW-mo/yr
|
- | - | - | - | - | |
| 03 | 2.4131: Size electric motors for peak operating efficiency | $205,559 | $25,240 |
$38,952
1,221,053
kWh
|
$24,206
-
kW-mo/yr
|
- |
$142,402
-
Tgal
|
- | - | - | |
| 04 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $21,723 | $100,000 |
$5,940
186,198
kWh
|
$3,703
-
kW-mo/yr
|
- | - |
$7,680
-
lb
|
$4,400 | - | |
| 05 | 2.7226: Use computer programs to optimize hvac performance | $10,445 | $308 | - | - |
$10,445
-
MMBtu
|
- | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,667 | $8,267 |
$3,860
120,996
kWh
|
$2,807
-
kW-mo/yr
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $5,062,757 | $11,458,328 |
$1,370,035
38,248,247
kWh
|
$914,734
-
kW-mo/yr
|
$(-1,129,277.2)
-
MMBtu
|
$142,402
-
Tgal
|
$7,680
-
lb
|
$4,400 | $3,752,784 | ||
| TOTAL IMPLEMENTED | $504,504 | $115,907 |
$192,727
1,342,049
kWh
|
$169,375
-
kW-mo/yr
|
- |
$142,402
-
Tgal
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs