ITAC Assessment: UU0148
ITAC logo
ITAC Assessment: UU0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Phosphate slurry
NAICS 212392: Phosphate Rock Mining
SIC 1475: Phosphate Rock
Sales Range $100
M
to 500
M
# of Employees 160
Plant Area 50,000
ft2
Annual Production 1,530,000
ton
Production Hrs. Annual 8,160
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,397,205 75,191,029
kWh
Electricity Demand $1,704,672 126,084
kW-mo/yr
Electricity Fees $63,845 -
Natural Gas $26,112 3,264
MMBtu
Waste Disposal Costs
Water Usage $1,604,810 11,064,960
Tgal
TOTAL YEARLY COSTS $5,796,645
RECOMMENDED SAVINGS* $5,062,757 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $504,504

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $4,526,086 $11,242,113 $1,171,368
36,720,000
kWh
$741,656
-
kW-mo/yr
$(-1,139,722.0)
-
MMBtu
- - - $3,752,784
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $292,277 $82,400 $149,916
-
kWh
$142,361
-
kW-mo/yr
- - - - -
03 2.4131: Size electric motors for peak operating efficiency $205,559 $25,240 $38,952
1,221,053
kWh
$24,206
-
kW-mo/yr
- $142,402
-
Tgal
- - -
04 3.5248: Separate and recycle scrap metal to foundry or for sale $21,723 $100,000 $5,940
186,198
kWh
$3,703
-
kW-mo/yr
- - $7,680
-
lb
$4,400 -
05 2.7226: Use computer programs to optimize hvac performance $10,445 $308 - - $10,445
-
MMBtu
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,667 $8,267 $3,860
120,996
kWh
$2,807
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $5,062,757 $11,458,328 $1,370,035
38,248,247
kWh
$914,734
-
kW-mo/yr
$(-1,129,277.2)
-
MMBtu
$142,402
-
Tgal
$7,680
-
lb
$4,400 $3,752,784
TOTAL IMPLEMENTED $504,504 $115,907 $192,727
1,342,049
kWh
$169,375
-
kW-mo/yr
- $142,402
-
Tgal
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs