Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Copper ore and nickel ore mining
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0052 #09 Y:2024 Pay bills on time to avoid late fees $9,940 -
MU0052 #08 Y:2024 Install vinyl strip / high speed / air curtain doors $14,663 $5,697
MU0052 #07 Y:2024 Improve air circulation with destratification fans / other methods $6,376 $10,087
MU0052 #06 Y:2024 Use photocell controls $84 $225
MU0052 #05 Y:2024 Reduce illumination to minimum necessary levels $1,186 -
MU0052 #04 Y:2024 Conserve energy by efficient use of vending machines $150 $400
MU0052 #03 Y:2024 Use or replace with energy efficient substitutes $508 $1,752
MU0052 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $337 $17
MU0052 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $15,133 -
UU0193 #06 Y:2021 Install occupancy sensors $946 $3,500
UU0193 #05 Y:2021 Reduce the pressure of compressed air to the minimum required $1,875 $5,000
UU0193 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,736 $1,307
UU0193 #03 Y:2021 Utilize higher efficiency lamps and/or ballasts $2,764 $4,720
UU0193 #02 Y:2021 Reschedule plant operations or reduce load to avoid peaks $371,933 $40,000
UU0193 #01 Y:2021 Use solar heat to make electricty $269,225 $7,636,800
UU0145 #07 Y:2018 Use photocell controls $661 $440
UU0145 #06 Y:2018 Utilize higher efficiency lamps and/or ballasts $2,250 $4,719
UU0145 #05 Y:2018 Install compressor air intakes in coolest locations $25,041 $5,000
UU0145 #04 Y:2018 Upgrade controls on compressors $47,010 $23,850
UU0145 #03 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $68,566 $36,000