Assessment Year | 2025 |
---|---|
Principal Product | Liner material |
NAICS | 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
55,000
ft2
|
Annual Production | 31,000
units
|
Production Hrs. Annual | 3,840
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,675 | 1,048,250 |
kWh
|
$0.080 |
Electricity Demand | $61,172 | 5,798 |
kW-mo/yr
|
$10.55 |
Electricity Fees | $1,260 | - |
|
- |
Natural Gas | $23,722 | 5,199 |
MMBtu
|
$4.56 |
TOTAL YEARLY COSTS | $169,829 | |||
RECOMMENDED SAVINGS* | $4,913 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,845 | $945 |
$2,012
25,209
kWh
|
$833
-
kW-mo/yr
|
- | |
02 | 2.4157: Establish a predictive maintenance program | $551 | $2,300 |
$490
6,135
kWh
|
$201
-
kW-mo/yr
|
$(-140.0) | |
03 | 2.4224: Upgrade controls on compressors | $425 | $1,975 |
$301
3,770
kWh
|
$124
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $398 | $700 |
$282
3,540
kWh
|
$116
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $361 | $500 |
$256
3,202
kWh
|
$105
-
kW-mo/yr
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $333 | $359 |
$238
2,981
kWh
|
$95
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $4,913 | $6,779 |
$3,579
44,837
kWh
|
$1,474
-
kW-mo/yr
|
$(-140.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs