ITAC Assessment: AS0300
ITAC logo
ITAC Assessment: AS0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Corrugated Cardboard Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area 260,000
ft2
Annual Production 600,000
thousand feet
Production Hrs. Annual 4,200
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $425,417 6,155,314
kWh
Electricity Demand $49,837 17,208
kW-mo/yr
Electricity Fees $36,647 -
Natural Gas $23,654 22,425
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $820,015 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $818,623

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $120 $525 $120
2,359
kWh
-
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,174 $300 $1,174
12,974
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $1,824 $30 $1,824
37,332
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,272 $60 $1,272
23,314
kWh
-
05 4.322: Eliminate old stock and modify inventory control $815,625 $640 - $815,625
TOTAL RECOMMENDED $820,015 $1,555 $4,390
75,979
kWh
$815,625
TOTAL IMPLEMENTED $818,623 $970 $2,998
50,306
kWh
$815,625
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs