Assessment Year | 2025 |
---|---|
Principal Product | Steel, coatings, inks |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3411: Metal Cans |
Sales Range | $50 M to 100M |
# of Employees | 63 |
Plant Area |
75,000
ft2
|
Annual Production | 1,300,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $233,471 | 4,542,191 |
kWh
|
$0.051 |
Electricity Demand | $181,438 | 10,362 |
kW-mo/yr
|
$17.51 |
Electricity Fees | $60,911 | - |
|
- |
Natural Gas | $512,379 | 127,333 |
MMBtu
|
$4.02 |
TOTAL YEARLY COSTS | $988,199 | |||
RECOMMENDED SAVINGS* | $24,533 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,159 | $1,185 | - | - |
$6,159
-
MMBtu
|
- | |
02 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $5,073 | $5,225 | - | - |
$5,073
-
MMBtu
|
- | |
03 | 2.4224: Upgrade controls on compressors | $4,574 | $4,959 |
$2,766
53,709
kWh
|
$1,808
-
kW-mo/yr
|
- | - | |
04 | 2.4157: Establish a predictive maintenance program | $4,321 | $5,597 |
$2,980
57,861
kWh
|
$1,944
-
kW-mo/yr
|
- | $(-603.0) | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,491 | $5,950 |
$843
16,365
kWh
|
$543
-
kW-mo/yr
|
$105
-
MMBtu
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,160 | $186 |
$705
13,696
kWh
|
$455
-
kW-mo/yr
|
- | - | |
07 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $941 | $4,075 | - | - |
$941
-
MMBtu
|
- | |
08 | 2.2511: Insulate bare equipment | $603 | $457 | - | - |
$603
-
MMBtu
|
- | |
09 | 2.4239: Eliminate or reduce compressed air usage | $211 | $283 |
$123
2,385
kWh
|
$88
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $24,533 | $27,917 |
$7,417
144,016
kWh
|
$4,838
-
kW-mo/yr
|
$12,881
-
MMBtu
|
$(-603.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs