ITAC Assessment: WV0693
ITAC logo
ITAC Assessment: WV0693
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Steel, coatings, inks
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $50
M
to 100
M
# of Employees 63
Plant Area 75,000
ft2
Annual Production 1,300,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,471 4,542,191
kWh
Electricity Demand $181,438 10,362
kW-mo/yr
Electricity Fees $60,911 -
Natural Gas $512,379 127,333
MMBtu
TOTAL YEARLY COSTS $988,199
RECOMMENDED SAVINGS* $24,533 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $6,159 $1,185 - - $6,159
-
MMBtu
-
02 2.2449: Recover heat from exhausted steam, hot air or hot water $5,073 $5,225 - - $5,073
-
MMBtu
-
03 2.4224: Upgrade controls on compressors $4,574 $4,959 $2,766
53,709
kWh
$1,808
-
kW-mo/yr
- -
04 2.4157: Establish a predictive maintenance program $4,321 $5,597 $2,980
57,861
kWh
$1,944
-
kW-mo/yr
- $(-603.0)
05 2.4221: Install compressor air intakes in coolest locations $1,491 $5,950 $843
16,365
kWh
$543
-
kW-mo/yr
$105
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,160 $186 $705
13,696
kWh
$455
-
kW-mo/yr
- -
07 2.2449: Recover heat from exhausted steam, hot air or hot water $941 $4,075 - - $941
-
MMBtu
-
08 2.2511: Insulate bare equipment $603 $457 - - $603
-
MMBtu
-
09 2.4239: Eliminate or reduce compressed air usage $211 $283 $123
2,385
kWh
$88
-
kW-mo/yr
- -
TOTAL RECOMMENDED $24,533 $27,917 $7,417
144,016
kWh
$4,838
-
kW-mo/yr
$12,881
-
MMBtu
$(-603.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs