ITAC Assessment: WV0677
ITAC logo
ITAC Assessment: WV0677
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Automotive Oil
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range $100
M
to 500
M
# of Employees 160
Plant Area 244,600
ft2
Annual Production 22,220
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $510,287 12,723,945
kWh
Electricity Demand $248,994 16,870
kW-mo/yr
Electricity Fees $48,634 -
Natural Gas $127,074 30,163
MMBtu
TOTAL YEARLY COSTS $934,989
RECOMMENDED SAVINGS* $66,623 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,491 $60,024 $12,819
319,613
kWh
$6,672
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $15,762 $7,782 $10,360
258,355
kWh
$5,402
-
kW-mo/yr
- - -
03 2.4224: Upgrade controls on compressors $10,271 $5,515 $6,758
168,536
kWh
$3,513
-
kW-mo/yr
- - -
04 2.4157: Establish a predictive maintenance program $7,107 $5,200 $9,548
238,099
kWh
$4,827
-
kW-mo/yr
- $(-7,268.0) -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,687 $1,418 $4,443
110,790
kWh
$2,244
-
kW-mo/yr
- - -
06 2.2425: Use flue gases to heat process or service water $3,254 $14,320 - - $3,254
-
MMBtu
- -
07 2.4151: Develop a repair/replace policy $2,517 $12,170 $1,948
48,584
kWh
$989
-
kW-mo/yr
- - $(-420.0)
08 2.4239: Eliminate or reduce compressed air usage $1,244 $540 $831
20,717
kWh
$413
-
kW-mo/yr
- - -
09 2.2511: Insulate bare equipment $290 $446 - - $290
-
MMBtu
- -
TOTAL RECOMMENDED $66,623 $107,415 $46,707
1,164,694
kWh
$24,060
-
kW-mo/yr
$3,544
-
MMBtu
$(-7,268.0) $(-420.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs