ITAC Assessment: WV0669
ITAC logo
ITAC Assessment: WV0669
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Polymers and LED Phosphor
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 260,000
ft2
Annual Production 4,400
lb
Production Hrs. Annual 2,125
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $351,720 4,901,528
kWh
Electricity Demand $82,362 9,728
kW-mo/yr
Electricity Fees $5,391 -
Natural Gas $251,112 35,890
MMBtu
TOTAL YEARLY COSTS $690,585
RECOMMENDED SAVINGS* $97,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2113: Repair or replace steam traps $19,270 $9,950 - - - $20,020
-
MMBtu
$(-750.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,884 $35,717 $14,123
196,694
kWh
$3,761
-
kW-mo/yr
- - -
03 2.2625: Chill water to the highest temperature possible $13,442 $5,225 $10,876
151,475
kWh
$2,566
-
kW-mo/yr
- - -
04 2.3191: Use demand controller or load shedder $11,909 $6,900 - $11,909
-
kW-mo/yr
- - -
05 2.7241: Install outside air damper / economizer on hvac unit $6,542 $14,640 $3,925
54,669
kWh
$2,617
-
kW-mo/yr
- - -
06 2.7313: Recycle air for heating, ventilation and air conditioning $6,200 $11,000 $827
11,518
kWh
$551
-
kW-mo/yr
- $7,245
-
MMBtu
$(-2,423.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,194 $16,795 $3,388
37,768
kWh
$1,806
-
kW-mo/yr
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,886 $1,088 $3,953
55,055
kWh
$933
-
kW-mo/yr
- - -
09 2.4224: Upgrade controls on compressors $3,954 $10,900 $3,200
44,569
kWh
$754
-
kW-mo/yr
- - -
10 2.2425: Use flue gases to heat process or service water $2,422 $7,600 - - - $2,422
-
MMBtu
-
11 2.1233: Analyze flue gas for proper air/fuel ratio $1,467 $940 - - - $1,467
-
MMBtu
-
12 2.4151: Develop a repair/replace policy $1,463 $1,143 $921
12,833
kWh
$610
-
kW-mo/yr
- - $(-68.0)
13 2.3212: Optimize plant power factor $1,227 $5,535 - - $1,227 - -
14 2.4157: Establish a predictive maintenance program $843 $1,200 $976
13,594
kWh
$652
-
kW-mo/yr
- - $(-785.0)
15 2.4235: Remove or close off unneeded compressed air lines $397 $1,920 $321
4,476
kWh
$76
-
kW-mo/yr
- - -
16 2.2511: Insulate bare equipment $357 $798 - - - $357
-
MMBtu
-
17 2.4221: Install compressor air intakes in coolest locations $135 $363 $109
1,517
kWh
$26
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $97,592 $131,714 $42,619
584,168
kWh
$26,261
-
kW-mo/yr
$1,227 $31,511
-
MMBtu
$(-4,026.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs