ITAC Assessment: KU0024
ITAC logo
ITAC Assessment: KU0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1981
Principal Product CONCRETE BLOCK
NAICS
n/a
SIC 3271: Concrete Block and Brick
Sales Range $1
M
to 5
M
# of Employees 16
Plant Area
n/a
Annual Production 1,500,000
pieces
Production Hrs. Annual 2,750
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,757 242,087
kWh
Natural Gas $18,258 7,183
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,574 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2441: Preheat boiler makeup water with waste process heat $1,669 $2,600 - $1,669
-
MMBtu
02 2.7261: Install timers and/or thermostats $556 - $74
1,465
kWh
$482
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $349 $357 $349
6,741
kWh
-
TOTAL RECOMMENDED $2,574 $2,957 $423
8,206
kWh
$2,151
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs