ITAC Assessment: WV0664
ITAC logo
ITAC Assessment: WV0664
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastic
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 257,000
ft2
Annual Production 30,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,391 1,388,672
kWh
Electricity Demand $40,226 3,813
kW-mo/yr
Natural Gas $131,643 13,036
MMBtu
LPG $40,537 1,569
MMBtu
Fuel Oil #1 $16,463 570
MMBtu
TOTAL YEARLY COSTS $338,260
RECOMMENDED SAVINGS* $15,333 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $3,899 $1,019 - - $3,899
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,056 $426 $2,201
27,930
kWh
$855
-
kW-mo/yr
- -
03 2.4224: Upgrade controls on compressors $2,777 $3,541 $2,017
25,597
kWh
$760
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,469 $12,134 $1,583
20,087
kWh
$886
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $911 $1,030 $658
8,352
kWh
$253
-
kW-mo/yr
- -
06 2.4157: Establish a predictive maintenance program $792 $1,500 $1,431
18,160
kWh
- - $(-639.0)
07 2.4151: Develop a repair/replace policy $535 $1,139 $577
7,316
kWh
$222
-
kW-mo/yr
- $(-264.0)
08 2.4231: Reduce the pressure of compressed air to the minimum required $391 $222 $285
3,618
kWh
$106
-
kW-mo/yr
- -
09 2.4239: Eliminate or reduce compressed air usage $382 $328 $276
3,497
kWh
$106
-
kW-mo/yr
- -
10 2.2511: Insulate bare equipment $121 $293 - - $121
-
MMBtu
-
TOTAL RECOMMENDED $15,333 $21,632 $9,028
114,557
kWh
$3,188
-
kW-mo/yr
$4,020
-
MMBtu
$(-903.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs