Assessment Year | 2024 |
---|---|
Principal Product | Saw Blades |
NAICS | 332216: Saw Blade and Handtool Manufacturing |
SIC | 3425: Saw Blades and Handsaws |
Sales Range | $50 M to 100M |
# of Employees | 410 |
Plant Area |
400,000
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 6,048
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,029,582 | 24,416,000 |
kWh
|
$0.042 |
Electricity Demand | $593,628 | 45,003 |
kW-mo/yr
|
$13.19 |
Natural Gas | $157,724 | 20,274 |
MMBtu
|
$7.78 |
TOTAL YEARLY COSTS | $1,780,934 | |||
RECOMMENDED SAVINGS* | $78,352 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $36,465 | $14,572 | - | - |
$36,465
-
MMBtu
|
- | |
02 | 2.7241: Install outside air damper / economizer on hvac unit | $10,156 | $46,100 |
$7,755
183,771
kWh
|
$2,401
-
kW-mo/yr
|
- | - | |
03 | 2.4224: Upgrade controls on compressors | $8,386 | $5,500 |
$1,211
28,693
kWh
|
$7,175
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,601 | $10,521 |
$2,227
52,769
kWh
|
$2,374
-
kW-mo/yr
|
- | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $4,538 | $6,417 |
$2,797
66,276
kWh
|
$1,741
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,172 | $700 |
$1,959
46,432
kWh
|
$1,213
-
kW-mo/yr
|
- | - | |
07 | 2.4151: Develop a repair/replace policy | $3,117 | $2,250 |
$2,292
54,319
kWh
|
$1,425
-
kW-mo/yr
|
- | $(-600.0) | |
08 | 2.4221: Install compressor air intakes in coolest locations | $2,752 | $4,400 |
$1,697
40,221
kWh
|
$1,055
-
kW-mo/yr
|
- | - | |
09 | 2.2511: Insulate bare equipment | $2,490 | $392 | - | - |
$2,490
-
MMBtu
|
- | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,247 | $750 |
$1,390
32,936
kWh
|
$857
-
kW-mo/yr
|
- | - | |
11 | 2.1233: Analyze flue gas for proper air/fuel ratio | $428 | $945 | - | - |
$428
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $78,352 | $92,547 |
$21,328
505,417
kWh
|
$18,241
-
kW-mo/yr
|
$39,383
-
MMBtu
|
$(-600.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs