ITAC Assessment: WV0662
ITAC logo
ITAC Assessment: WV0662
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Saw Blades
NAICS 332216: Saw Blade and Handtool Manufacturing
SIC 3425: Saw Blades and Handsaws
Sales Range $50
M
to 100
M
# of Employees 410
Plant Area 400,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 6,048
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,029,582 24,416,000
kWh
Electricity Demand $593,628 45,003
kW-mo/yr
Natural Gas $157,724 20,274
MMBtu
TOTAL YEARLY COSTS $1,780,934
RECOMMENDED SAVINGS* $78,352 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7314: Reduce ventilation air $36,465 $14,572 - - $36,465
-
MMBtu
-
02 2.7241: Install outside air damper / economizer on hvac unit $10,156 $46,100 $7,755
183,771
kWh
$2,401
-
kW-mo/yr
- -
03 2.4224: Upgrade controls on compressors $8,386 $5,500 $1,211
28,693
kWh
$7,175
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,601 $10,521 $2,227
52,769
kWh
$2,374
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $4,538 $6,417 $2,797
66,276
kWh
$1,741
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,172 $700 $1,959
46,432
kWh
$1,213
-
kW-mo/yr
- -
07 2.4151: Develop a repair/replace policy $3,117 $2,250 $2,292
54,319
kWh
$1,425
-
kW-mo/yr
- $(-600.0)
08 2.4221: Install compressor air intakes in coolest locations $2,752 $4,400 $1,697
40,221
kWh
$1,055
-
kW-mo/yr
- -
09 2.2511: Insulate bare equipment $2,490 $392 - - $2,490
-
MMBtu
-
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,247 $750 $1,390
32,936
kWh
$857
-
kW-mo/yr
- -
11 2.1233: Analyze flue gas for proper air/fuel ratio $428 $945 - - $428
-
MMBtu
-
TOTAL RECOMMENDED $78,352 $92,547 $21,328
505,417
kWh
$18,241
-
kW-mo/yr
$39,383
-
MMBtu
$(-600.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs