ITAC Assessment: SD0017
ITAC logo
ITAC Assessment: SD0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product IRRIGATION EQUIPMENT
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 475
Plant Area
n/a
Annual Production 7,305,442
pieces
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,595 2,379,543
kWh
Natural Gas $86,627 28,037
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,451 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,753

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $422 $527 $422
9,672
kWh
- -
02 2.2511: Insulate bare equipment $77 $214 $77
1,758
kWh
- -
03 2.7123: Keep lamps and reflectors clean $9,331 $15,354 $7,681
190,211
kWh
- $1,650
04 2.7226: Use computer programs to optimize hvac performance $2,621 $400 $2,536
58,324
kWh
$85
-
MMBtu
-
TOTAL RECOMMENDED $12,451 $16,495 $10,716
259,965
kWh
$85
-
MMBtu
$1,650
TOTAL IMPLEMENTED $9,753 $15,881 $8,103
199,883
kWh
- $1,650
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs