Assessment Year | 2024 |
---|---|
Principal Product | Lumber |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
95,000
ft2
|
Annual Production | 5,000
thousand feet
|
Production Hrs. Annual | 2,400
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $183,650 | 3,003,864 |
kWh
|
$0.061 | |
Electricity Demand | $159,046 | 10,782 |
kW-mo/yr
|
$14.75 | |
Electricity Fees | $4,141 | - |
|
- | |
Natural Gas | $166,292 | 23,139 |
MMBtu
|
$7.19 | |
Waste Disposal Costs | |||||
Water Usage | $68,017 | 5,810 |
Tgal
|
$11.71 | |
TOTAL YEARLY COSTS | $581,146 | ||||
RECOMMENDED SAVINGS* | $171,607 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $28,437 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3511: Use plant owned transformers or lease transformers | $114,700 | $500,000 | - | - | - | - | - | $14,700 | - | $100,000 | |
02 | 2.2128: Use steam condensate for hot water supply (non-potable) | $17,471 | $75,000 |
$(-2,655.0)
(-43,457)
kWh
|
- | - |
$5,874
-
MMBtu
|
$13,292
-
Tgal
|
- | $960 | - | |
03 | 2.2511: Insulate bare equipment | $8,319 | $1,861 | - | - | - |
$8,319
-
MMBtu
|
- | - | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,117 | $9,888 |
$2,783
45,544
kWh
|
$3,334
-
kW-mo/yr
|
- | - | - | - | - | - | |
05 | 2.2425: Use flue gases to heat process or service water | $4,882 | $17,230 | - | - | - |
$4,882
-
MMBtu
|
- | - | - | - | |
06 | 2.4224: Upgrade controls on compressors | $3,448 | $14,655 |
$2,017
33,020
kWh
|
$1,431
-
kW-mo/yr
|
- | - | - | - | - | - | |
07 | 2.4157: Establish a predictive maintenance program | $2,997 | $1,500 |
$1,862
30,479
kWh
|
$2,242
-
kW-mo/yr
|
- | - | - | $(-1,107.0) | - | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,912 | $637 | - | - | - |
$2,912
-
MMBtu
|
- | - | - | - | |
09 | 2.3212: Optimize plant power factor | $2,669 | $13,005 | - | - | $2,669 | - | - | - | - | - | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,265 | $1,350 |
$1,203
19,694
kWh
|
$1,062
-
kW-mo/yr
|
- | - | - | - | - | - | |
11 | 2.4151: Develop a repair/replace policy | $1,896 | $8,107 |
$1,047
17,144
kWh
|
$1,269
-
kW-mo/yr
|
- | - | - | $(-420.0) | - | - | |
12 | 2.4157: Establish a predictive maintenance program | $1,376 | $1,500 |
$2,483
40,639
kWh
|
- | - | - | - | $(-1,107.0) | - | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,364 | $3,507 |
$582
9,525
kWh
|
$782
-
kW-mo/yr
|
- | - | - | - | - | - | |
14 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,191 | $1,070 |
$630
10,314
kWh
|
$561
-
kW-mo/yr
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $171,607 | $649,310 |
$9,952
162,902
kWh
|
$10,681
-
kW-mo/yr
|
$2,669 |
$21,987
-
MMBtu
|
$13,292
-
Tgal
|
$12,066 | $960 | $100,000 | ||
TOTAL IMPLEMENTED | $28,437 | $29,420 |
$10,590
173,339
kWh
|
$9,250
-
kW-mo/yr
|
- |
$11,231
-
MMBtu
|
- | $(-2,634.0) | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs