ITAC Assessment: WV0653
ITAC logo
ITAC Assessment: WV0653
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Insulation glass rubber
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 313
Plant Area 375,000
ft2
Annual Production 480,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,954,293 24,469,791
kWh
Natural Gas $228,334 94,903
MMBtu
Waste Disposal Costs
Water Usage $81,773 11,192,061
Tgal
TOTAL YEARLY COSTS $2,264,400
RECOMMENDED SAVINGS* $293,829 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $130,527

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $75,356 $210,000 $75,356
943,488
kWh
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $46,512 $82,920 $46,512
582,133
kWh
- - -
03 2.4224: Upgrade controls on compressors $38,158 $64,250 $38,158
477,751
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $33,555 $52,800 $33,555
419,965
kWh
- - -
05 2.7241: Install outside air damper / economizer on hvac unit $27,203 $93,600 $27,203
340,466
kWh
- - -
06 3.4151: Minimize water usage $13,630 $45,516 $(-1,859.0)
(-23,275)
kWh
- $17,577
-
Tgal
$(-2,088.0)
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,961 $800 $10,961
137,234
kWh
- - -
08 2.4151: Develop a repair/replace policy $10,683 $9,567 $11,163
139,759
kWh
- - $(-480.0)
09 2.4221: Install compressor air intakes in coolest locations $8,240 $12,390 $8,091
101,259
kWh
$149
-
MMBtu
- -
10 2.4322: Use or replace with energy efficient substitutes $5,884 $14,800 $5,884
73,674
kWh
- - -
11 2.4231: Reduce the pressure of compressed air to the minimum required $5,758 $2,675 $5,758
72,016
kWh
- - -
12 2.1221: Replace obsolete burners with more efficient ones $4,538 $21,440 - $4,538
-
MMBtu
- -
13 2.1233: Analyze flue gas for proper air/fuel ratio $3,757 $1,288 - $3,757
-
MMBtu
- -
14 2.4157: Establish a predictive maintenance program $3,320 $1,500 $5,887
73,711
kWh
- - $(-2,567.0)
15 2.7142: Utilize higher efficiency lamps and/or ballasts $3,200 $3,036 $3,200
40,068
kWh
- - -
16 2.2511: Insulate bare equipment $1,621 $787 $1,254
15,689
kWh
$367
-
MMBtu
- -
17 2.2425: Use flue gases to heat process or service water $1,453 $7,240 - $1,453
-
MMBtu
- -
TOTAL RECOMMENDED $293,829 $624,609 $271,123
3,393,938
kWh
$10,264
-
MMBtu
$17,577
-
Tgal
$(-5,135.0)
TOTAL IMPLEMENTED $130,527 $197,019 $113,961
1,426,592
kWh
$4,124
-
MMBtu
$17,577
-
Tgal
$(-5,135.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs