Assessment Year | 2023 |
---|---|
Principal Product | Truck Manufacturing and Assembly |
NAICS | 336120: Heavy Duty Truck Manufacturing |
SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
20,300
ft2
|
Annual Production | 110,000
units
|
Production Hrs. Annual | 8,064
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,329,080 | 17,195,517 |
kWh
|
$0.077 |
Natural Gas | $1,194,162 | 157,581 |
MMBtu
|
$7.58 |
TOTAL YEARLY COSTS | $2,523,242 | |||
RECOMMENDED SAVINGS* | $643,194 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $62,155 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.5195: Change product design to reduce energy requirements | $235,798 | $32,000 |
$235,798
3,050,431
kWh
|
- | |
02 | 2.7313: Recycle air for heating, ventilation and air conditioning | $189,197 | $575,150 | - |
$189,197
-
MMBtu
|
|
03 | 2.7226: Use computer programs to optimize hvac performance | $123,784 | $178,886 |
$104,455
1,351,300
kWh
|
$19,329
-
MMBtu
|
|
04 | 2.7262: Separate controls of air handlers from ac/ heating systems | $42,136 | $4,100 |
$29,765
385,061
kWh
|
$12,371
-
MMBtu
|
|
05 | 2.1221: Replace obsolete burners with more efficient ones | $32,260 | $112,625 | - |
$32,260
-
MMBtu
|
|
06 | 2.7314: Reduce ventilation air | $16,843 | $4,400 | - |
$16,843
-
MMBtu
|
|
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,857 | $5,425 |
$(-637.0)
(-8,242)
kWh
|
$2,494
-
MMBtu
|
|
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $917 | $933 | - |
$917
-
MMBtu
|
|
09 | 2.2511: Insulate bare equipment | $402 | $758 | - |
$402
-
MMBtu
|
|
TOTAL RECOMMENDED | $643,194 | $914,277 |
$369,381
4,778,550
kWh
|
$273,813
-
MMBtu
|
||
TOTAL IMPLEMENTED | $62,155 | $15,616 |
$29,128
376,819
kWh
|
$33,027
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs