ITAC Assessment: WV0641
ITAC logo
ITAC Assessment: WV0641
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Truck Manufacturing and Assembly
NAICS 336120: Heavy Duty Truck Manufacturing
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 20,300
ft2
Annual Production 110,000
units
Production Hrs. Annual 8,064
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,329,080 17,195,517
kWh
Natural Gas $1,194,162 157,581
MMBtu
TOTAL YEARLY COSTS $2,523,242
RECOMMENDED SAVINGS* $643,194 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,155

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.5195: Change product design to reduce energy requirements $235,798 $32,000 $235,798
3,050,431
kWh
-
02 2.7313: Recycle air for heating, ventilation and air conditioning $189,197 $575,150 - $189,197
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $123,784 $178,886 $104,455
1,351,300
kWh
$19,329
-
MMBtu
04 2.7262: Separate controls of air handlers from ac/ heating systems $42,136 $4,100 $29,765
385,061
kWh
$12,371
-
MMBtu
05 2.1221: Replace obsolete burners with more efficient ones $32,260 $112,625 - $32,260
-
MMBtu
06 2.7314: Reduce ventilation air $16,843 $4,400 - $16,843
-
MMBtu
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,857 $5,425 $(-637.0)
(-8,242)
kWh
$2,494
-
MMBtu
08 2.1233: Analyze flue gas for proper air/fuel ratio $917 $933 - $917
-
MMBtu
09 2.2511: Insulate bare equipment $402 $758 - $402
-
MMBtu
TOTAL RECOMMENDED $643,194 $914,277 $369,381
4,778,550
kWh
$273,813
-
MMBtu
TOTAL IMPLEMENTED $62,155 $15,616 $29,128
376,819
kWh
$33,027
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs